My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> -- 1 <br /> 8-13.3(2) Furnish and Place Monument Castings <br /> Provide monument cases and covers where indicated on the Plans, or where designated <br /> by the Engineer, in accordance to COE Standard Drawing No. 323 and 324. <br /> 8-13.3(3) Adjust Existing Monument Castings to Grade <br /> Adjust existing monument castings to grade in the same manner as for manholes in 7- <br /> 05.3(1) of these Special Provisions. <br /> 8-13.4 Measurement <br /> Delete all paragraphs in 8-13.4 and substitute the following: t <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-13.5 Payment <br /> Delete all paragraphs in 8-13.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be ' <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-14 CEMENT CONCRETE SIDEWALKS , <br /> 8-14.2 Materials <br /> Supplement 8-14.2 by adding the following: <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-14.3 Construction Requirements <br /> Supplement 8-14.3 by adding the following: ' <br /> Provide concrete mix with slump not exceeding 3-1/2 inches. <br /> Add coloring agent for matching the color of newly constructed cement concrete <br /> sidewalks to the color of adjacent existing cement concrete sidewalks. Add to the <br /> concrete during mixing in an amount not to exceed 1-1/2 pounds per cubic yard of <br /> concrete. Do NOT use coloring agent in curb ramps. <br /> 8-14.3(1) Excavation <br /> Supplement 8-14.3(1) by adding the following: <br /> Obtain approval of the Engineer to provide, place and compact Gravel Borrow <br /> meeting the requirements of 9-03.14 of the Standard Specification if there is <br /> insufficient suitable native material on the Project to fill low areas for the sidewalk <br /> subgrade. <br /> 8-14.3(2) Forms <br /> Supplement 8-14.3(2) by adding the following: <br /> Before setting the forms, grade the subgrade to two inches below established grade <br /> to accommodate two inches of crushed surfacing top course. <br /> Install sidewalk drains prior to placing forms if the Plans calls for sidewalk drains or <br /> the Engineer directs installation of sidewalk drains. <br /> 8-14.3(3) Placing and Finishing Concrete <br /> Supplement 8-14.3(3) by adding the following: <br /> Form joints by first cutting a groove in the concrete with a tee bar of a depth equal <br /> to, but not greater than the joint filler material, and then work the premolded joint <br /> filler into the groove. Position premolded joint filler for through and contraction joints <br /> in true alignment at right angles to the line of the sidewalk and be normal to and <br /> flush with the surface. <br /> Water Main Replacement"V" Division 8—MISC CONSTRUCTION April,2021 <br /> WO No.—UP3730 SP—196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.