1 <br /> ' KRAZAN&ASSOCIATES,INC. <br /> KA Project No. 092-20006 <br /> DRAFT Geotechnical Engineering Investigation <br /> ' Everett Water Main"V" <br /> May 7,2020 <br /> Page No. 13 <br /> I <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> General <br /> ' It is our opinion from a geotechnical standpoint, based on our subsurface investigation, that the project <br /> areas should be suitable for the proposed water main installation using conventional open trench and <br /> shoring methods. <br /> Existing Pavement: The pavement encountered throughout most of the project areas consisted of <br /> approximately 3 to 6 inches of asphalt. One of the soil boring locations, near the intersection of <br /> Olympic Boulevard and Seahurst Avenue, encountered 10 inches of Portland cement concrete <br /> underlying the asphalt pavement. It may be prudent to further explore the pavement section in the <br /> alignment of the planned water main replacement prior to the beginning of excavation for the project. <br /> Summary of Subsurface Conditions: The soils that underlie most of the project areas are interpreted <br /> to be native glacial soils, which typically have good strength with respect to soil bearing and overall <br /> stability and should provide suitable support for the planned water main. However, very loose to <br /> ' medium dense undocumented fill and stiff to hard clay and silt were encountered in some of our soil <br /> borings. <br /> For areas where the proposed new water main will traverse loose fill soils, it might be prudent to <br /> compact the bottom of the utility trench with appropriate equipment, such as a hoepack, prior to water <br /> pipe installation. Compaction of loose trench bottom soils should reduce the potential for future utility <br /> pipe subsidence. <br /> The clay and silt soils are interpreted to be ancient lacustrine (lake) deposits. The clay and silt soils <br /> ' should have moderate strength with respect to soil bearing and should provide adequate support for the <br /> planned water main. However,the clayey and silty soils are considered to be highly moisture sensitive <br /> and are not considered to be suitable for trench backfill. Imported granular materials should be <br /> considered for trench backfill for portions of this project where fine-grained soils are exposed. The silty <br /> sand with gravel soils may be suitable for use as trench backfill,but will depend on the moisture content <br /> of the soils at the time of utility construction. <br /> It is possible that layers of undocumented fill could be encountered overlying the native soils in some <br /> portions of the project areas. Caving of the excavation walls in the clayey and silty soils, as well as any <br /> loose to medium dense granular soil or fill, should be anticipated. The contractor should be prepared to <br /> shore the excavation walls or bench the excavation to a stable configuration. <br /> Groundwater: We observed groundwater seepage in soil boring B-4 at a depth of approximately 5.0 <br /> feet, and in soil boring B-7 at a depth of about 5.0 feet. Moist to wet conditions were encountered in <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br /> 1 <br />