My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Appendix B <br /> Page B.3 <br /> between conditions indicated by or deduced from said report and the actual conditions encountered <br /> during the progress of the work. <br /> DUST CONTROL: The work includes dust control as required for the alleviation or prevention of any <br /> dust nuisance on or about the site or the borrow area, or off-site if caused by the Contractor's operation <br /> either during the performance of the earthwork or resulting from the conditions in which the Contractor <br /> leaves the site. The Contractor shall assume all liability, including Court costs of codefendants, for all <br /> claims related to dust or windblown materials attributable to his work. <br /> SITE PREPARATION <br /> Site preparation shall consist of site clearing and grabbing and preparations of foundation materials for <br /> receiving fill. <br /> CLEARING AND GRUBBING: The Contractor shall accept the site in this present condition and <br /> shall demolish and/or remove from the area of designated project, earthwork all structures,both surface <br /> and subsurface, trees, brush, roots, debris, organic matter, and all other matter determined by the <br /> Geotechnical Engineer to be deleterious. Such materials shall become the property of the Contractor <br /> and shall be removed from the site. <br /> Tree root systems in proposed building areas should be removed to a minimum depth of 3 feet and to <br /> such an extent which would permit removal of all roots larger than 1 inch. Tree root removed in <br /> parking areas may be limited to the upper 1'/2 feet of the ground surface. Backfill or tree root <br /> excavation should not be permitted until all exposed surfaces have been inspected and the Geotechnical <br /> Engineer is present for the proper control of backfill placement and compaction. Burning in areas, <br /> which are to receive fill materials,shall not be permitted. <br /> SUBGRADE PREPARATION: Surfaces to receive Structural fill shall be prepared as outlined above, <br /> excavated/scarified to a depth of 12 inches, moisture-conditioned as necessary, and compacted to 95 <br /> percent compaction. <br /> Loose and/or areas of disturbed soils shall be moisture conditioned and compacted to 95 percent <br /> compaction. All ruts, hummocks, or other uneven surface features shall be removed by surface grading <br /> prior to placement of any fill material. All areas which are to receive fill materials shall be approved by <br /> the Geotechnical Engineer prior to the placement of any of the fill material. <br /> EXCAVATION: All excavation shall be accomplished to the tolerance normally defined by the Civil <br /> Engineer as shown on the project grading plans. All over excavation below the grades specified shall be <br /> backfilled at the Contractor's expense and shall be compacted in accordance with the applicable <br /> technical requirements. <br /> FILL AND BACKFILL MATERIAL: No material shall be moved or compacted without the <br /> presence of the Geotechnical Engineer. Material from the required site excavation may be utilized for <br /> construction site fills provided prior approval is given by the Geotechnical Engineer. All materials <br /> utilized for constructing site fills shall be free from vegetable or other deleterious matter as determined <br /> by the Geotechnical Engineer. <br /> PLACEMENT, SPREADING AND COMPACTION: The placement and spreading of approved fill <br /> materials and the processing and compaction of approved fill and native materials shall be the <br /> Krazan and Associates,Inc. <br /> Offices Serving The Western United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.