My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIN INN 11111 N MR Mill an NIB <br /> NOTES <br /> 1. CURB EXPOSURE VARIES ACCORDING TO SITE AND <br /> DRAINAGE REQUIREMENTS. <br /> LENGTH OF TRANSIT STOP L <br /> FACE OF <br /> CURB <br /> O <br /> d <br /> 0 <br /> �1 <br /> A <br /> RADIUS TO ACCOMMODATE <br /> DESIGN VEHICLE <br /> 0 <br /> CURVE DATA <br /> D L A° <br /> 4.00 12.00 37 <br /> r'0 5.00 13.00 41 <br /> 6.00 14.00 46 <br /> D 7.00 15.00 49 <br /> f <br /> CITY OF EVERETT <br /> PUBLIC WORKS DEPARTMENT <br /> �CI <br /> a flYAN SASS ITOM HOOD I PAUL WIIHELM I°." `MRB D�26f2D17 <br /> ^-� rwouoowww <br /> IAQ CURB EXTENSIONS 314 <br /> I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.