My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ) <br /> I I <br /> W20-1 <br /> W4-2L W20-5L W20-1 <br /> ROAD <br /> WORK LEFT ROAD <br /> AHEAD WITH WORK <br /> CLOSED4 AHEAD <br /> ROLL SPACING AHEM50'MIN 100'MAX g +L, TA LENGH <br /> (TABPERLE A)T SEE SEE SEE <br /> �y 50'MIN _NOTE 1 NOTE 1 NOTE 1 <br /> • 9 ♦ 4, ♦ ®�}�• ♦ 7 KEEP ♦_•"'�-1--'•' - - _ Y-♦--♦—. -40- - <br /> --___/, - d 1��� RIGHT 111 . <br /> R47B �y-yy♦ • • ♦ ♦ ♦ ♦ • / - -• <br /> --op- • <br /> 1- z 1 1 f <br /> Yccj Z x w N NOTES LEGEND <br /> =u 3 m -I j ROAD— WORK 1. DISTANCE BETWEEN SIGNS SHALL BE 100'FOR CONE OR CHANNELIZING DEVICE SEE STANDARD <br /> � y 3 <br /> I-,IS OJ / AHEAD RESIDENTIAL STREETS(25 MPH)AND 350'FOR DRAWING 713. <br /> 08 03 -' ARTERIAL ROADWAYS <br /> 3 w,~>- <br /> ▪ m m o z W20-1 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR <br /> og ± NIGHT-TIME USE(OPTIONAL). <br /> LL <br /> LL 3. DISTANCES MAY VARY AS APPROVED BY THE <br /> I ENGINEER. <br /> TABLE A 4. SPOTTERS REQUIRED WHENEVER THE CONTRACTOR <br /> SPEED TAPER LENGTH CONE SPACING I MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE <br /> (MPH) FOR SHIFT WIDTH ALONG TAPER WORK SITE WITH MATERIALS OR EQUIPMENT <br /> 10' 12' (FT) I (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). <br /> 25 105' 125' 25 I 5. SIGN SIZE PER MUTCD. CITY OF EVERETT <br /> 30 150' 180' 30 N16. THIS PLAN IS PROVIDED AS A GUIDE ONLY.FOR PUBLIC WORKS DEPARTMENT <br /> El 35 205' 245' 35 SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANS <br /> 40 270' 320' 40 ( I SEE CURRENT MUTCD. °"'1 SASS ICORErliTh I PAgLHELM I°"*"ESN 02/28/2018 <br /> 45 450' 540' 45 I I TRAFFIC CONTROL PLAN 5 L <br /> ANE ROADWAY WITH LEFT LANE 707 <br /> #, • <br /> CLOSURE FAR SIDE OF INTERSECTION <br /> I I <br /> IIIIII M E - - M E 11111 NM NM N EN I 11111 ME M n MN MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.