My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I <br /> W9-3 W20-1 <br /> WITH <br /> CCENTES ROAD <br /> ROLL SPACING WORKD WORK <br /> (MIN 50'MAX100') TRUCK AHEAD <br /> WITH BUFFER SPACE <br /> FLASHING SEE TABLE A TAPER LENGTH <br /> BEACON (SEE TABLE A) 200' 200' <br /> al <br /> WORK AREA <br /> :444. 'pm 3_,A <br /> :o. <br /> N 200' -4-0 200' TAPER LENGTH <br /> (SEE TABLE A) <br /> 20'M WK <br /> ROAD CENTER LANE &TYPE IN 2 BARRICADOR SITEE <br /> WORK C D NOTES LEGEND <br /> AHEAD EAD <br /> WITH 1. DISTANCE BETWEEN SIGNS SHALL BE 100'FOR RI CONE OR CHANNELIZING DEVICE SEE STANDARD <br /> RESIDENTIAL STREETS(25 MPH)AND 350'FOR DRAWING 713. <br /> W20-1 W9-3 ARTERIAL ROADWAYS <br /> 30 <br /> 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR <br /> NIGHT-TIME USE(OPTIONAL). <br /> 0 <br /> 3 3. DISTANCES MAY VARY AS APPROVED BY THE <br /> ENGINEER. ' <br /> TABLE A 4. SPOTTERS REQUIRED WHENEVER THE CONTRACTOR <br /> o SPEED CONE SPACING BUFFER MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE <br /> (MPH) (FT) SPACING WORK SITE WITH MATERIALS OR EQUIPMENT <br /> g TANGENT TAPER (FT) (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). <br /> 25 25 55 5. SIGN SIZE PER MUTCD. CITY OF EVERETT <br /> 30 30 85 6. THIS PLAN IS PROVIDED AS A GUIDE ONLY.FOR PUBLIC WORKS DEPARTMENT <br /> 35 35 20 120 SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANS q <br /> 6 40 40 170 SEE CURRENT MUTCD. RYAN SASS ICOREYHERT I krAIWELM I'.""ESH 02/28/2018 <br /> 45 45 220 TRAFFIC CONTROL PLAN --"^"'°~ <br /> S 5 LANE ROADWAY WITH 711 <br /> TWO WAY LEFT TURN LANE CLOSURE <br /> 1 1 <br /> — — — — MI — — — — — — ENII INIII Ell — 101111 I= MIMI UM <br />
The URL can be used to link to this page
Your browser does not support the video tag.