My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> CITY OF EVERETT SPECIA <br /> L PROVISIONS <br /> I2-07.3 Construction Requirements 136 <br /> 2-07.4 Measurement 137 <br /> I 2-07.5 Payment 137 <br /> 2-09 STRUCTURE EXCAVATION 137 <br /> 2-09.2 Materials 137 <br /> 2-09.3 Construction Requirements 137 <br /> 2-09.4 Measurement 138 <br /> 2-09.5 Payment 138 <br /> I2-11 TRIMMING AND CLEANUP 139 <br /> 2-11.3 Construction Requirements 139 <br /> I 2-11.4 Vacant 139 <br /> 2-11.4 Measurement 139 <br /> 2-11.5 Payment 139 <br /> I DIVISION 4 - BASES 141 <br /> 4-04 BALLAST AND CRUSHED SURFACING 141 <br /> 4-04.1 Description 141 <br /> I4-04.3 Construction Requirements 141 <br /> 4-04.4 Measurement 141 <br /> ' 4-04.5 Payment 141 <br /> 4-06 ASPHALT TREATED BASE 141 <br /> 4-06.2 Materials 142 <br /> I 4-06.3 Construction Requirements 142 <br /> 4-06.4 Measurement 144 <br /> 4-06.5 Payment 144 <br /> IDIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 145 <br /> 5-04 HOT MIX ASPHALT 145 <br /> I5-04.1 Description 145 <br /> 5-04.2 Materials 145 <br /> 5-04.3 Construction Requirements 147 <br /> 1 5-04.4 Measurement 166 <br /> 5-04.5 Payment 166 <br /> 5-06 PAVEMENT PATCHING (******) 166 <br /> I 5-06.1 Description 166 <br /> 5-06.2 Materials 166 <br /> 5-06.3 Construction Requirements 166 <br /> I5-06.4 Measurement 168 <br /> 5-06.5 Payment 168 <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> IWATERMAINS, AND CONDUITS 169 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 169 <br /> I 7-08.1 Description 169 <br /> 7-08.2 Materials 169 <br /> 7-08.3 Construction Requirements 169 <br /> I Water Main Replacement"V" Table of Contents - April 2021 <br /> WO No.- UP3730 SP -v <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.