My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I CITY OF EVERETT SPECIAL PROVI <br /> SIONS <br /> I8-04.5 Payment 193 <br /> 8-05 PRIVATE IMPROVEMENTS 193 <br /> I <br /> 8-05.1 Description 193 <br /> 8-05.2 Materials 193 <br /> 8-05.3 Construction Requirements 193 <br /> I8-05.4 Measurement 194 <br /> 8-05.5 Payment 194 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 194 <br /> 8-06.1 Description 194 <br /> 8-06.2 Materials 194 <br /> I 8-06.3 Construction Requirements 194 <br /> 8-06.4 Measurement 194 <br /> 8-06.5 Payment 195 <br /> I 8-13 MONUMENTCASES 195 <br /> 8-13 SURVEY MONUMENTS AND CASES (******) 195 <br /> 8-13.1 Description 195 <br /> I8-13.2 Materials 195 <br /> 8-13.3 Construction Requirements 195 <br /> I8-13.4 Measurement 196 <br /> 8-13.5 Payment 196 <br /> 8-14 CEMENT CONCRETE SIDEWALKS 196 <br /> I 8-14.2 Materials 196 <br /> 8-14.3 Construction Requirements 196 <br /> 8-14.4 Measurement 198 <br /> I 8-14.5 Payment 198 <br /> 8-22 PAVEMENT MARKING 198 <br /> 8-22.1 Description 198 <br /> I8-22.4 Measurement 198 <br /> 8-22.5 Payment 198 <br /> DIVISION 9 - MATERIALS 199 <br /> I 9-03 AGGREGATES 199 <br /> 9-03.6 Vacant 199 <br /> I 9-03.6 Aggregates for Asphalt Treated Base (ATB) 199 <br /> 9-03.22 Sand Backfill for Pipe Zone (******) 200 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 200 <br /> 9-14.1 Topsoil 200 <br /> 9-14.2 Seed 203 <br /> 9-14.3 Fertilizer 203 <br /> I9-14.4 Mulch and Amendments 203 <br /> 9-14.6 Plant Materials 203 <br /> 9-30 WATER DISTRIBUTION MATERIALS 204 <br /> 9-30.1 Pipe 204 <br /> 9-30.2 Fittings 204 <br /> I Water Main Replacement"V" Table of Contents - April 2021 <br /> WO No.- UP3730 SP -vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.