My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I . <br /> DIVISION B - BID ITEM DESCRIPTIONS <br /> Schedule A—Watermain <br /> Bid Item 1 - Mobilization <br /> ' Measurement and Payment: Lump Sum (LS) <br /> The lump sum bid for mobilization shall constitute complete compensation for all of <br /> ' Contractor's preconstruction costs of preparatory work and operations including, but not <br /> limited to, those necessary for the movement of his personnel, equipment, supplies and <br /> incidentals to the Project; for the establishment of his offices, buildings and other facilities <br /> necessary for Work on this Project; for premiums on bonds and insurance for the Project, <br /> landfor Work and operations that he must perform or costs he must incur before beginning <br /> production work on the various items on the Project. Mobilization also includes, but is not <br /> limited to, posting construction identification signs, securing permits, establishing safety <br /> ' and security measures, preparing a traffic control plan(s), preconstruction photographs, <br /> developing a Schedule of Values for lump sum bid items, submitting the project schedule <br /> and providing product and material submittals. Also include mobilization costs for all <br /> ' subcontracted work along with all costs for utility coordination noted on the Plans and in the <br /> Specifications. <br /> Items not included in this item include, but are not limited to: <br /> ' (a) Work covered by a specific bid item or Work that is to be included in a bid item <br /> or items. <br /> (b) Profit, interest on borrowed money, overhead or management costs. <br /> ' Partial payments will be made for the lump sum contract price for"Mobilization" as follows: <br /> (a) When 5% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization, or 5% of the total original contract <br /> amount, whichever is the least, will be paid. <br /> (b) When 10% of the total original contract amount is earned from other bid items. <br /> 100% of the amount bid for mobilization, or 10% of the total contract amount, <br /> whichever is the least, will be paid. <br /> Upon completion of all work on the project, payment of any amount bid for mobilization in <br /> excess of 10% of the total original contract amount will be paid. <br /> ' Bid Item 2 - Surveying <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for surveying will be the ratio of actual pipe installed and backfilled to the <br /> total quantity of pipe listed in the Proposal. <br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments materials, and other equipment necessary for <br /> the setting and monitoring the location, elevation, alignment and grade of the Work as <br /> specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br /> and the Plans. <br /> The lump sum bid item also includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials and other equipment necessary for <br /> verifying the rim and invert elevations, prior to construction, of all existing manholes and <br /> pipes where connections are to be made. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all <br /> labor, tools, survey instruments, materials and other equipment necessary for obtaining the <br /> "as constructed" location and elevations of the Work, in particular, sewer pipe invert <br /> Water Main Replacement"V" Division B—BID DESCRIPTIONS April 2021 <br /> WO No.—UP3730 SP-3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.