My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' Measurement shall be per linear foot as delineated bythe Contractor <br /> and approved by the <br /> Inspector prior to removal. <br /> ' The unit price per linear foot for restoration of concrete curbs or curb and gutter and shall <br /> be full compensation for all materials, tools, labor and equipment necessary to complete <br /> the Work in accordance with the Plans, COE Standard Drawings, Standard Specifications <br /> and these Special Provisions, including sawcutting, removal, loading, hauling and disposal. <br /> Bid Item 48 - Cement Concrete Curb, Type E-1 <br /> ' Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for restoration of concrete curbs and shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions, including sawcutting, removal, loading, hauling and disposal. <br /> Bid Item 49 - Asphalt Extruded Wedge Curb <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> ' Measurement shall be per linear foot along the line and slope of the completed curb as <br /> approved by the Inspector. <br /> The unit price per linear foot for construction of curb shall be full compensation for all <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 50 - Permanent Pavement Marking <br /> Measurement and Payment: Lump Sum (LS) <br /> This lump sum bid item includes all costs associated with furnishing all labor, materials, and <br /> other equipment necessary for restoring and replacing permanent traffic marking, including <br /> and not limited to, stop bars, turn arrows, lettering, crosswalks, reflectors, delineators, and <br /> ' lane or fog-line striping removed or damaged by the Contractor's work in accordance with <br /> the COE Standard Drawing No. 720, Special Provisions and Plans. <br /> Bid Item 51 - Portable Changeable Message Signs <br /> Measurement and Payment: Unit Price per Hour(HR) <br /> Measurement shall be will be measured by the hour for the time that each sign is operating <br /> as shown on an approved Traffic Control Plan and in accordance with 1-10.3(3)C of these <br /> ' Special Provisions. <br /> The unit price, when applied to the number of units measured for this item, shall be full <br /> compensation for all costs of labor, materials and equipment incurred by the Contractor in <br /> ' procuring and operating all portable changeable message signs required for the project and <br /> for transporting these signs to and from the project. <br /> Bid Item 52 - Baseline COVID-19 Requirements <br /> ' Measurement and Payment: Lump Sum (LS) <br /> This lump sum bid item includes all costs necessary for the duration of the Work for <br /> compliance with Baseline COVID-19 Requirements. <br /> ' Water Main Replacement"V" Division B—BID DESCRIPTIONS April 2021 <br /> WO No.—UP3730 SP -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.