Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE <br /> BIDDER M04'{\CD C ,q l)C., a1 l flC . <br /> Item <br /> ITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT <br /> No. QtY <br /> I1 Mobilization LS 1 $ ` iCW ,r'" $ K05,c 0 <br /> I <br /> 2 Surveying LS 1 $\ - 0 Goy $ \\ t Zoo nu <br /> 3 SPCC Plan LS 1 $ 25 6- 4.$ J25 A <br /> 4 Force Account FA 1 $ 80,000.00 80 000.00 <br /> 5 Traffic Control Labor HR 3 000 •• .)c6 030 •. \TA CI CO VD <br /> 6 Traffic Control - Off-Duty Police Officer FA 1 $ 5,500.00 5 500.00_ <br /> I7 Maintenance and Protection of Traffic Control LS 1 $ 'II i SOO 0,oa 22 I SOO 1-)0 <br /> `31) <br /> . <br /> 8 Trench Excavation Safety Systems LS 1 $ 5 t�° �c�$ S,a n <br /> 9 Street Cleaning and Sweeping HR 108 $�\�S "0 $ \"1 5 a - <br /> 10 Erosion/Water Pollution Control FA 1 $ 3,300.00 $ 3 300.00 <br /> I Saw-Cutting Asphalt Concrete Pavement, Final 22 co <br /> 11 Joint Cut, Up to 6 inch Thickness LF 14,280 $ J $ 52 ,$ 4, <br /> Saw-Cutting Asphalt Concrete Pavement, Final <br /> I <br /> 12 Joint Cut, Additional 1-inch Thickness LF 1,070 $ \ `Do $ \101Q , r'° <br /> Sawcutting Concrete Pavement, Final Joint <br /> 13 Cut up to 10-in Thickness LF 1,000 $ \O „�0 $ \O,ID 00 .(9° <br /> Saw-Cutting Concrete Curb &Gutter& <br /> 14 Sidewalk LF 423 $ —1 - ZD $ '3 OCAS 60 <br /> I15 Foundation Material, Class A or B TON 100 $ Cho D $ 4, ,DOO Q D-. <br /> I <br /> 16 Gravel Borrow TON 2,122 $ 21 .,-6 $ 5%,(413 30 <br /> Ductile Iron Pipe for Water Main, 4-Inch <br /> 17 Diam. LF 59 $ \Z,lP .UO $ 1,4 oa „14° <br /> IDuctile Iron Pipe for Water Main, 6-Inch 18 Diam. LF 200 $ CI ' S $ I(101 aoQ <br /> 1 Water Main Replacement"V" Division P-PROPOSAL April,2021 <br /> Work Order No.-UP3730 SP-19 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />