My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I , <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> SUBCONTRACTORS FORM <br /> I 1. For heating, ventilation, air conditioning, plumbing(as defined by RCW Chap. 18.106) and electrical <br /> work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder <br /> MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not <br /> part of the scope of Work, Bidder shall write "NO WORK". <br /> I <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> I 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, structural steel <br /> installation and rebar installation, Bidder fails(1)to submit as part of the Bid the names of such <br /> I B. Subcontractors, (2) to name itself to perform such Work, or(3)to write"No Work"; or <br /> Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> electrical, structural steel installation and rebar installation subcontractors applies only to proposed <br /> I heating, ventilation and air conditioning, plumbing, electrical structural steel installation and rebar <br /> installation subcontractors who will contract directly with the general contractor submitting the Bid to <br /> the City. <br /> I 5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below must be <br /> submitted with the bid proposal or within one hour of the published bid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below must be submitted <br /> I <br /> with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> I HEATING <br /> Subcontractor, bidder or"no work" MUST be none- vropseC1 <br /> stated <br /> I VENTILATION AND AIR CONDITIONING o52C� <br /> Subcontractor, bidder or"no work" MUST be 'none- PrvP <br /> stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> I Subcontractor, bidder or"no work" MUST be r c 't. Q r�Pa s ed <br /> stated <br /> ELECTRICAL (as described in RCW Chap. 3exv,Le, tTA.e-C{-k- <br /> ' 19.28) <br /> Subcontractor, bidder or "no work" MUST be 1 LPI S s+ h W 41£S-no�l�t»h �S <br /> stated <br /> STRUCTURAL STEEL INSTALLATION <br /> I Subcontractor, bidder or"no work" MUST be (hr P�PDa� <br /> stated <br /> REBAR INSTALLATION <br /> Subcontractor, bidder or"no work" MUST be > prcspo5itcl <br /> Istated <br /> I <br /> 111 <br /> Water Main Replacement"V" Division P-PROPOSAL April, 2021 <br /> Work Order No.-UP3730 SP-21 <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.