My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I'"" , H M C CONSTRUCTION, INC. <br /> "An Equal Opportunity Employer" <br /> 13600—44th ST NE ** Lake Stevens,WA 98258 <br /> Phone(425)377-9130 ** Fax(425) 377-9135 <br /> REFERENCES <br /> Project: 36th Ave W. Corridor Improvements ' <br /> Location: Lynnwood, WA <br /> Owner: City of Lynnwood <br /> Address: PO Box 5008 <br /> Lynnwood,WA 98046 <br /> Contact: Brian Delp <br /> Phone: (425) 775-1971 <br /> Contract Amount: $8,668,842 Award Date: 5/15/18 <br /> Description: Demolition, Stormwater System,Detention Tanks, Retaining Walls, Soldier Pile Walls, <br /> Traffic Signal System and other work. <br /> Thomco Project Manager: Dave Thomas Thomco Superintendent: Dennis Johnson <br /> Completion Date: February In Progress <br /> Project: North Wetmore Stormwater Separation <br /> Location: Everett,WA <br /> Owner: City of Everett <br /> Address: 3101 Cedar Street <br /> Everett, WA 98201 <br /> Contact: Tom Fuchs <br /> Phone: (425) 257-8895 <br /> Contract Amount: $3,395,788 Award Date: 04/18/18 <br /> Description: Construction of approximately10,351 LF of 6"to 30" storm drain pipe and restoration. <br /> Thomco Project Manager: Bob Bergley Thomco Superintendent: Scott Wilcox <br /> Completion Date: In progress <br /> Project: 238th St SW Walkway Project ' <br /> Location: Edmonds, WA <br /> Owner: Edmonds, WA <br /> Address 121 Fifth Avenue North <br /> Edmonds, WA 98020 <br /> Contact: Ryan Hague Project Engineer <br /> Phone: (425)771-0220 ext. 1347 <br /> Contract Amount: $453,528 Award Date: 3/02/2018 <br /> Description: Improvement of City owned curb& sidewalks, storm, asphalt and flashing beacon system and <br /> other work. <br /> Thomco Project Manager: Bob Bergley Thomco Superintendent: Dennis Johnson <br /> Completion Date: In Progress <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.