My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Description: Construction of approximately 14,440 if of HDPE waterlines,a concrete water storage tank, <br /> well controls and rehabilitation,control valves, and electrical conduits. <br /> Thomco Project Manager: Bob Bergley Thomco Superintendent: Todd Rork <br /> Completion Date: 10/2015 <br /> ' Project: Boeing 767 Temporary Building <br /> Location: Everett, WA <br /> Owner: Boeing Company General Contractor: Washington Patriot <br /> ' Address: 100 N Riverside Dr Address: PO Box 2031 <br /> Chicago, IL 98335 Gig Harbor, WA 98335 <br /> Phone: (253) 853-2304 Fax(253) 853-5921 <br /> Contract Amount: $1,288,026.00 Award Date: 1/2015 <br /> ' Description: Traffic control, excavation work for electrical,erosion control, demolition, site work, concrete <br /> prep, excavation for footings, backfill,utilities <br /> Thomco Project Manager: Ed Thomas Thomco Superintendent: Scott Wilcox <br /> ' Completion Date: 9/2015 <br /> Project: Health Sciences Building,Bellevue College <br /> Location: Bellevue, WA <br /> ' Owner: Dept of Enterprise Svcs <br /> Facilities Div Eng General Contractor: Bayley Construction <br /> Address: PO Box 41476 Address: 8005 SE 28th St <br /> Olympia, WA 98504 Mercer Island,WA 98040 <br /> Phone: (206)261-8884 Fax(206) 343-7728 <br /> Contract Amount: $854,034.00 Award Date: 9/2013 <br /> Description: Mobilization, supervision, safety, erosion control, demolition,earthwork and surface <br /> preparation, sanitary sewer, storm sewer, fire &domestic water <br /> Thomco Project Manager: Dave Thomas Thomco Superintendent: Mike Allen <br /> Completion Date: 6/2015 <br /> Project: Joint Transportation Center <br /> Location: 4302 134th Street NE,Marysville, WA 98271 <br /> ' Owner: Marysville School District No. 25 <br /> Address: 4220 80th St NE <br /> Marysville,WA 98270 <br /> ' Phone: (425) 508-8560 <br /> Contract Amount: $881,250.00 Award Date: 11/29/12 <br /> Description: Earthwork and utility work for the new joint transportation center for the Marysville School <br /> District. <br /> Thomco Project Manager: Dave Thomas Thomco Superintendent: Bob Bergley <br /> Completion Date: 9/16/2014 <br /> ' Project: Repair Sports Fields <br /> Location: Bremerton, WA <br /> Owner: NAVFAC NW General Contractor: Washington Patriot <br /> ' Address: 467 W Street Address: PO Box 2031 <br /> Bremerton,WA 98314 Gig Harbor, WA 98335 <br /> Phone: (253) 853-2304 Fax(253) 853-5921 <br /> Contract Amount: $1,009,838.05 Award Date: 4/2013 <br /> Description: Repairing sports fields at Naval Base Kitsap <br /> Thomco Project Manager: Ed Thomas Thomco Superintendent: Scott Wilcox <br /> ' Completion Date: November 2013 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.