Laserfiche WebLink
I <br /> ICITY OF EVERETT,WASHINGTON <br /> I CONTRACT <br /> tt <br /> THIS CONTRACT is made and entered into this h day of (VI Al , 20Ds, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> IWashington, hereinafter called the "City," and <br /> TNC�i` CO CoN$11JCTtOt , 1►.1G, a <br /> W AS VI H...1bTOtii icA Qo RIM ,hereinafter called the "Contractor." <br /> IIn consideration of the sums to be paid to it by the City,Contractor hereby covenants and agrees to furnish <br /> all labor, tools, materials, equipment, and supplies required to build and construct and to build and <br /> I construct in a workmanlike manner the work, improvements, and appurtenances in accordance with the <br /> Specifications and Plans entitled: "WATER MAIN REPLACEMENT"V" (the"Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> Ireference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> IB. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2020 as modified <br /> by all amendments thereto as of the date of bid opening of this Project ("Standard <br /> ISpecifications"). <br /> D. Special Provisions <br /> E. Plans,Drawings and Project Specifications <br /> F. Addenda(if any) <br /> I G. Payment Bond and Performance Bond <br /> H. Contractor's Proposal/Bid(conformed copy dated 4"O1-k -a ) t ) <br /> I. All provisions required by law whether set forth and reproduced herein or not <br /> 2. Time for Completion. Substantial completion shall be achieved within 95 working days of the <br /> effective date of the Notice to Proceed. Physical completion shall be within 15 working days of the actual <br /> Idate of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br /> in the event that the Contractor does not complete the work in all respects and have it ready for use by the <br /> Isubstantial completion date stated. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br /> computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special Provisions, <br /> I for each and every working day required to accomplish substantial completion of the work in excess of <br /> the period established above for substantial completion. For overruns in contract time occurring after the <br /> physical completion date, liquidated damages shall be assessed at the rate of ten percent (10%) of the <br /> 1 amount computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special <br /> Provisions, until the work is physically complete. <br /> I 4. Contract Amount. The amount of this Contract is a� Di)�,�� <br /> ($ J ) and is based on the proposal/bid submitted by Contractor dated <br /> 4- QN-1,O DA . The basis for final payment will be the actual amount of work performed according <br /> to the Contract Documents and payments, whether partial or final, shall be made as specified therein. <br /> Water Main Replacement"V" Division C—CONTRACT April, 2021 <br /> IWork Order#UP3730 SP -27 <br />