My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 — GENERAL REQUIREMENTS <br /> rSupplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> Work being performed includes furnishing all labor, materials and equipment necessary to <br /> construct approximately 5,500 linear feet of water main other such appurtenances and <br /> 1 performing all Work as required by the Contract, in accordance with the Contract Plans and <br /> Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located along Olympic Boulevard <br /> • <br /> between Seahurst Drive and Ridgemont Drive, along Ridgemont Drive from Olympic <br /> Boulevard to 4420 Ridgemont Drive, along Pine Street between Hewitt Avenue and 25th <br /> Street, and along Wetmore Avenue between 7th Street to 10th Street. <br /> ' Design Engineer <br /> (******) <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> attention of Arnie Roshak, P.E., City Project Manager, aroshak@everettwa.gov. <br /> Standard Specifications <br /> (******) <br /> All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> Documents. These Specifications are incorporated by reference, made a part of this Contract <br /> and shall control and guide all activities within this Project whether referred to directly, <br /> paragraph by paragraph. <br /> WSDOT/APWA "2020 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended, hereinafter referred to as the "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the <br /> Standard Specifications and these Special Provisions, all of which are made a part of the <br /> Contract Documents, shall govern all of the Work. The following latest edition of other <br /> specifications and standard plans shall apply to the extent to which they are called out in <br /> these Plans and Special Provisions. <br /> 1. City of Everett "Design and Construction Standards and Specifications", latest <br /> edition as found on the Web at"http://everettwa.gov/DocumentCenter/View/243". <br /> 2. WSDOT Amendments to the Standard Specifications as found on the Web at <br /> ' "http://www.wsdot.wa.gov/Business/Construction/SpecificationsAmendmentsGSPs. <br /> htm". <br /> 3. "Standard Plans for Road and Bridge Construction", as prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices (MUTCD)." <br /> 5. APWA Standards. <br /> I 6. AWWA Standards. <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the <br /> comparable Standard. Specification, or is a new Provision. The deletion, amendment, <br /> alteration, or addition to any subsection or portion of the Standard Specifications is meant to <br /> pertain only to that particular portion of the section, and in no way should it be interpreted <br /> that the balance of the section does not apply. <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-35 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.