My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northshore Parks and Recreation Service Area 6/1/2021
>
Contracts
>
6 Years Then Destroy
>
2021
>
Northshore Parks and Recreation Service Area 6/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 11:20:50 AM
Creation date
6/18/2021 11:19:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northshore Parks and Recreation Service Area
Approval Date
6/1/2021
Council Approval Date
5/12/2021
End Date
11/20/2021
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Use of City's excess capacity with JOC Forma
Tracking Number
0002954
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17.4 Engineering News Record occasionally revises indices. Engineering News Record <br /> Construction Cost Indices used in the calculations described above will be those currently <br /> published at the time the Economic Price Adjustment calculation is performed. No <br /> retroactive adjustments will be made as a result of an Engineering News Record revision. <br /> Revised Construction Cost Indices, if any, will be used in subsequent calculations. <br /> 17.5 Under all circumstances, should the Contractor submit a Job Order Proposal with inaccurate <br /> Adjustment Factors, the act of submission by the Contractor is a waiver of all rights to any <br /> further compensation above the Job Order Price submitted in the Job Order Proposal. <br /> 17.6 The Contractor cannot delay submission of the Job Order Proposal past the due date to <br /> take advantage of a scheduled update of the Adjustment Factors, In that event, the <br /> Contractor shall use the Adjustment Factors that would have been in effect without the <br /> delay. <br /> 17.7 The Adjustment Factor for Non Pre-priced Tasks will remain constant for the duration of the <br /> Contract. <br /> END ARTICLE 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.