|
Part Number Description Quantity Unit Price Amount
<br /> 10740 Single Post Swing F/S,5"Od[Basic: ) 1 $1,141.00 $1,141.00
<br /> RDU Anchor Away Panels 1 $9,080.00 $9,080.00
<br /> 6238 Shadow Play Flower[Basic: ] 2 $4,948.00 $9,896.00
<br /> DOIP Custom Double Sided Play Panels- 4 $1,220.00 $4,880.00
<br /> Includes custom art and text
<br /> 45"x45"
<br /> Delivering to customer in Everett,WA
<br /> STPLT Trike Path Stoplight System- 1 $6,861.00 $6,861.00
<br /> *12 Volt stoplight w/automatic cycling
<br /> *Solar Powered w/photo sensor for operation from dawn to dusk
<br /> *Includes battery operated backup power
<br /> Turf Turf Surfacing- 9724 $21.22 $206,343.28
<br /> ****List Price$251,540.49***,discounted per Omnia Contract
<br /> 9,724 sf,CP PL929 turf with Envirofill
<br /> 8'CFH(using buffings and binder)
<br /> Includes 426 If composite nailers at periemter
<br /> Based on good job access,PREVAILING Wages
<br /> Does NOT include design,graphics,mounding
<br /> INSTALL Sitework- 1 $12,915.00 $12,915.00
<br /> Includes:
<br /> Install through crushed rock
<br /> Recieve freight on site
<br /> out of area fee
<br /> Prevailing wage
<br /> INSTALL Installation of GT Structure w/roof panels- 1 $33,680.00 $33,680.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Shadow Play Tri Runner- 1 $4,405.00 $4,405.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Xscape Swings- 1 $2,070.00 $2,070.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Modern City swings- 1 $2,760.00 $2,760.00
<br /> Prevailing Wage
<br /> INSTALL Installation of 4 double play panels- 1 $4,135.00 $4,135.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Sensory Wave- 1 $1,726.00 $1,726.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Sensory Done- 1 $2,415.00 $2,415.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Shadow Play Flower- 1 $690.00 $690.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Flower Talk Tubes qty(2)- 1 $690.00 $690.00
<br /> Prevailing Wage
<br /> INSTALL Installation of ECHO Unit- 1 $5,980.00 $5,980.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Trike Path Stoplight- 1 $1,210.00 $1,210.00
<br /> Prevailing Wage
<br /> INSTALL Installation of Shadow Play Flowers- 1 $1,555.00 $1,555.00
<br /> Prevailing Wage
<br /> PPB Payment and Performance Bond 1 S9,410.00 $9,410.00
<br /> Contract:OMNIA SubTotal $588,223.28
<br /> Discount $66,326.86
<br /> Freight $12,800.00
<br /> Tax $52,400.25
<br /> Total $587,096.67
<br />
|