My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7657
>
Resolutions
>
Resolution 7657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2021 2:14:05 PM
Creation date
7/1/2021 2:14:04 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
7657
Date
6/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 7657 <br /> A RESOLUTION adopting the Annual Transportation Improvement <br /> Program (TIP) update for 2022 to 2027. <br /> WHEREAS, RCW 35.77.010 requires that the legislative body of each city and town <br /> shall prepare and adopt a"Comprehensive Transportation Program" for the ensuing six <br /> calendar years to serve as a guide in carrying out a coordinated transportation facility <br /> construction program, and that said legislative body shall annually thereafter review, <br /> amend as necessary, and readopt said Comprehensive Transportation Program; and <br /> WHEREAS, in compliance with RCW 35.77.010 there exists such a Comprehensive <br /> Transportation Program(known as the Six-year Transportation Improvement Program or <br /> TIP) for the City of Everett that identifies various types of transportation improvements <br /> needed, and estimated costs; and <br /> WHEREAS, The City Council of the City of Everett has reviewed the work <br /> accomplished under said program, determined current and future City transportation <br /> needs, and based on these findings has prepared a Six-year Transportation Improvement <br /> Program for the next six years; and <br /> WHEREAS, the adoption of the update to the City of Everett Transportation <br /> Improvement Program authorizes city staff to apply for and receive various state and <br /> federal funds to implement the projects in the program; and <br /> WHEREAS, after due notice, a hearing on the proposed program was held by the City <br /> Council in accordance with RCW 35.77.010; and <br /> WHEREAS,the proposed program is consistent with, and implements the City of Everett <br /> Comprehensive Plan; <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br /> OF EVERETT that the 2022-2027 annual update of the Six-year Transportation <br /> Improvement Program, a copy of which is attached hereto as Exhibit A and incorporated <br /> herein as if fully set forth, is adopted and the City Engineer is directed to file a copy of <br /> this program with the Washington State Secretary of Transportation pursuant to RCW <br /> 35.77.010 and pursue funding for the projects cited the program whereve available. <br /> ts-44..e R/ <br /> ouncilmember Intro ucing Resolution <br /> PASSED and APPROVED this 16th day of June, 2021. <br /> Co cil Preside A <br />
The URL can be used to link to this page
Your browser does not support the video tag.