Laserfiche WebLink
Date 3/9/18 <br />Company Name: <br />Address: <br />City/ State/ Zip <br />Acutanza STS <br />1514Third Place <br />Kirkland / WA / 98033 <br />Proposed <br />ICR <br />Proposed <br />Fixed <br />Fee <br />1.1 <br />0.3 <br />Subject: Safe Harbor Rate <br />Attention: Manager, Consultant Services Office (Contracting Officer) <br />Below are the highest anticipated hourly billing rates for the identified labor classifications. <br />Acutanza STS certifies they have an accounting system that contains separate accounts <br />or sub -accounts for unallowable costs in accordance with FAR (48 CFR Part 31), and the capacity to track direct costs that are <br />allocable directly to projects. <br />Acutanza STS <br />also certifies they have a labor- charging/ time keeping system that is <br />complete and sufficiently detailed to allow for a proper determination of direct and indirect labor costs. <br />By my signature below, Acutanza STS acknowledges that our labor rate and time- <br />keeping system are subject to a compliance review to be conducted by WSDOT within 60 days of approval of this rate. <br />Labor <br />Classification <br />Labor <br />Rate <br />Cost <br />indirect <br />Rate <br />Fixed <br />Fee <br />NTE <br />Rate <br />Principal <br />$73.00 <br />$80.30 <br />$21.90 <br />$175.20 <br />Respectfully, <br />Signature <br />Title <br />Jeanne Acutanza <br />Digitally signed by Jeanne Acutanza <br />Date: 2018.03.09 09:06:13-08'00' <br />President, Acutanza STS <br />Add Row <br />Delete Row <br />