My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:31:31 PM
Creation date
7/2/2021 2:58:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E V E R E T T City Council Agenda Item Cover Sheet <br />Project title: Replacement of Reservoir 2 Project; Testing and Special Inspections Professional Service <br />Agreement. <br />Council Bill # <br />Agenda dates requested: <br />June 30, 2021 <br />Briefing <br />Proposed action <br />Consent 6/30/21 <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Profession Services <br />Agreement (2 copies) <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Mike Kangas <br />Phone number: <br />(425) 257-7731 <br />Email: <br />mkangas@everettwa.gov <br />Initialed by: <br />2 LS <br />Department head <br />Administration <br />Council President <br />Consideration: <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Professional Services Agreement <br />Replacement of Reservoir 2 Project <br />Material Testing and Consulting, Inc <br />Rucker Hill <br />Construction Contract Award April 21, 2021 <br />336 — Water and Sewer Systems Improvements <br />Fiscal summary statement: <br />Budget for the project was established by Ordinance No. 3792.20 at $22,100,000.00 <br />Project summary statement: <br />This agreement is to provide on call materials testing and special inspections for the <br />Replacement of Reservoir 2 Project. <br />This project will replace the existing 109-year old Reservoir 2 with a new five Million <br />Gallon (MG) storage facility to be located on the property adjacent to existing Res 2. The <br />new storage facility will obviate the need for the existing Reservoir 2, thus eliminating <br />the risk for failure of the western and southern embankments of the reservoir which are <br />in poor condition. The project will also replace old 24-inch transmission lines between <br />existing Reservoir 2 and Reservoir 1 and include the construction of a new 1,200 sf <br />operations/storage building. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign this Professional Services Agreement with Materials Testing <br />and Consulting, Inc. in the amount of $63,171.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.