Laserfiche WebLink
TERMINATION OF <br /> BONDING MEMBRANE Wing Point <br /> ADHESIVE FLASHING WILL VARY <br /> ' BONDING <br /> ADHESIVE '' <br /> TERMINATION OF MEMBRANE Associates <br /> SEALANT(IF REQUIRED FOR FLASHING WILL VARY <br /> SPECIFIC SYSTEM) <br /> SHEET-METAL SCUPPER SECURED TO John Bieriy AIA <br /> L WALL AND DECK AND/OR OPTIONAL 206.793.9469 • <br /> SEALANT(IF REQUIRED FOR WOOD BLOCKING WingpOlntaSSOC@gmalLCOm <br /> ADHERED MEMBRANE FLASHING <br /> I SPECIFIC SYSTEM) .. <br /> r j4111' 0 SHEET-METAL SCUPPER SECURED TO <br /> SEALANT(IF REQUIRED FOR WALL AND DECK OR OPTIONAL WOOD <br /> #4,1> 2902 <br /> SPECIFIC SYSTEM) OPTIONAL: BLOCKING <br /> WOOD BLOCKIN <br /> 41*tt <br /> ADHERED MEMBRANE <br /> FLASHING , . <br /> SEALANT(IF REQUIRED FOR RuckerAve . <br /> ` I 4114.10, <br /> APPROX. 2"(TYP.) SPECIFIC SYSTEM) <br /> APPROX. 2"(TYP.) Everett) WA <br /> SEALANT WATER `` <br /> BLOCK \ SEALANT WATER BLOCK <br /> WOOD BLOCKING <br /> Renovation for the .. <br /> NOTES: Skold Family Trust <br /> 1. CONDUCTOR HEAD TO BE 1" MIN. BELOW BOTTOM OF THROUGH-WALL SCUPPER. <br /> • <br /> 1 . FLASHING AT THROUGH-WALL SCUPPER 2 . FLASHING AT OVERFLOW SCUPPER <br /> PLUMBING VENT STACK ‘,..5 feet <br /> SEALANT ADHERED MEMBRANE FLASHING <br /> DRAWBAND BASE MEMBRANE ATTACHMENT <br /> *TOE OF MOS= <br /> INSTALL SEALANT OR SEALANT TAPE AS REQUIRED FOR SPECIFIC <br /> BETWEEN PIPE AND PREMANUFACTURED SYSTEM -SEE NOTE 3 <br /> MEMBRANE FLASHING DRAIN <br /> I <br /> -BASE MEMBRANE ATTACHMENT AS L - STRAINER <br /> REQUIRED FOR SPECIFIC SYSTEM <br /> COPYRIGHT 2020 WING POINT ASSOCIATES LLC <br /> SEAM TAPE / ALL RIGHTS RESERVED <br /> SEALANT(IF REQUIRED FOR II <br /> ' '1. THE SPECIFIC SYSTEM) i • <br /> F PREMANUFACTURED �,/ I` 1 <br /> AS i MEMBRANE FLASHING ROOF DECK - <br /> I 1 - ItAk 4,,d , <br /> CLAMPING RING <br /> DECK CLAMP <br /> ROUND CUT IN EPDM MEMBRANE EXTEND <br /> APPROX. 1"PAST CLAMP RING. <br /> CAST-IRON DRAIN BOWL <br /> NOTES: ✓ - INSTALL COMPATIBLE SEALANT <br /> BETWEEN DRAIN BOWL FLANGE AND (/) <br /> 1.VENT STACKS AND OTHER PIPES SHOULD HAVE A MINIMUM OF 12 INCHES OF ROOF MEMBRANE <br /> CLEARANCE ON ALL SIDES FROM WALLS, CURBS AND OTHER PROJECTIONS TO <br /> FACILITATE PROPER FLASHING. TAPERED INSULATION SUMP-SEE NOTE 1 - <br /> 2. REFER TO MANUFACTURERS' SPECIFICATIONS FOR SPECIFIC REQUIREMENTS FOR NOTES: <br /> BASE MEMBRANE ATTACHMENT AND 1. MEMBRANE SEAMS SHOULD NOT INTERSECT DRAIN CLAMPING RING. F".. <br /> PLACEMENT. SEAMS THAT FALL WITHIN DRAIN SUMP SHOULD BE STRIPPED IN. 1 <br /> LI <br /> 2. REFER TO MANUFACTURERS'SPECIFICATIONS FOR REQUIREMENTS <br /> FOR BASE MEMBRANE ATTACHMENT AND PLACEMENT. <br /> 3 . PLUMBING VENT (PREMFGR. BOOT) 4 . ROOF DRAIN (OVERFLOW SIM.) <br /> O <br /> _EXISTING WALL / _--- SIDING NOT SHOWN FOR CLARITY CC <br /> INSTALL SEALANT AND TOOL TO FACILITATE BUILDING WRAP-OVERLAP SHEET <br /> LLI <br /> WATER RUNOFF METAL MIN.2" <br /> DRILLED IN EXPANSION FASTENERS <br /> SHEET METAL COUNTERFLASHING / ' MEMBRANE SHEET CLOSURE <br /> o ADHERED TO WALL X <br /> COMPRESSIBLE ELASTOMERIC SEALANT/ / AF W <br /> TAPE TO SPAN IRREGULARITIES <br /> /� TERMINATION BAR FASTENED 12"O.C. <br /> ' a SHEET METAL EXPANSION JOINT COVER <br /> "PP- <br /> SEALANT BEHIND MEMBRANE z ' III • WITH T-TYPE CLEAT <br /> �) co <br /> 440111 <br /> ADHERED MEMBRANE FLASHING LI <br /> BONDING ADHESIVE <br /> s a ADHERED MEMBRANE FLASHING <br /> 9 <br /> CD♦ � BONDING ADHESIVE <br /> REVISION <br /> REINFORCED MEMBRANE ATTACHMENT STRIP ' REINFORCED MEMBRANE ATTACHMENT <br /> LABEL DATE DESCRIPTION <br /> WITH SEAM PLATES AND FASTENERS STRIP WITH SEAM PLATES AND <br /> COMPRESSI: E FASTENERS 2 6/6/20 PERMIT COMMENTS <br /> INSULATION 2 X 6 MIN.TREATED WOOD NAILERS <br /> ATTACHED TO SUBSTRATE-OVERALL <br /> THICKNESS TO MATCH INSULATION <br /> 5 . FLASHING AT EXISTING WALL 6 . FLASHING AT ROOF/PENTHOUSE WALL <br /> I <br /> SEALANT(IF REQUIRED FOR THE <br /> 2 w SPECIFIC SYSTEM) <br /> D _ / SEALING MATERIAL ADHERED MEMBRANE <br /> � , SELF-ADHERING MEMBRANE � , <br /> z z , / ROOFTOP EQUIPMENT FRAME SHEET-ME FLASHING FLASHING(EXTEND APPROX. 2" <br /> _ C EDGE FLASHING SEALANT BEYOND FLANGE) } <br /> ( GASKETED FASTENERS-MIN. <br /> `O -I 1 I I TWO FASTENERS PER SIDE SEALA SEALANT WATER SHEET-METAL GRAVEL STOP 0, <br /> u- <br /> 1 -SHEET-METAL RECEIVER WITH A, APPROX. <br /> REMOVABLE COUNTERFLASHING BONDING ADHESIVE 2,. SEALANT WATER BLOC K44 2 <br /> \' <br /> CORNER FLASHING PIECE AT EACH CORNER- FIELD SHEET • <br /> i Le<0410 SEAL ALL EXPOSED EDGES _. c, EXTENDED <br /> BELOW C € "@ � caa <br /> WOOD CURB ADHERED MEMBRANE FLASHING 2 X 6 MIN. R .T r4 �. BLOCKIN- 0 ✓ ,,A <br /> �\ WOOD NAILE I; .rt �) r r` Ifr <br /> BONDING ADHESIVEt�a °k <br /> pr, <br /> 2 X 6 MIN.TREATED WOO REINFORCED MEMBRANE ATTACHMENT STRIP ATTACHED TO <br /> NAILERS ATTACHED TO SUBSTRATE-OV RALE <br /> 4,'A.0.0p.,- 1)'-' <br /> SUBSTRATE-OVERALL WITH SEAM PLATES AND FASTENERS THICKNESS TO M TCH <br /> THICKNESS TO MATCH INSULATION DATE <br /> INSULATION SEPARATE MEMBRANE GUTTER SPACERS INSTALLED <br /> SHEET EXTENDED BELOW BETWEEN GUTTER BRACKETS <br /> , BLOCKING <br /> SHEET-METAL GUTTER.FRON GUTTER BRACKET SUPPORT 6/23/20 <br /> NOTES: OF GUTTER SHOULD BE A MIN. STIFFENING BAR <br /> 1" LOWER THAN THE BACK TO <br /> 1.THE CURBS,TOP WOOD NAILER AND SEAL STRIP ARE TO BE ALLOW OVERFLOW.SUPPLIED BY THE CURB MANUFACTURER. i SCALE <br /> 2.WHEN POSSIBLE,THE EQUIPMENT SHOULD NOT BE SET UNTIL THE NOTES: BONDING AD IVE <br /> ROOF MEMBRANE AND FLASHING HAVE BEEN INSTALLED. 1. GUTTER BRACKETS ARE RECOMMENDED TO BE AT LEAST ( . <br /> ONE GAUGE HEAVIER THAN GUTTER STOCK. 2 X 6 MIN.WOOD NAILER TTACHED TO <br /> 3.WHERE THE SKYLIGHT FRAME OVERLAPS THE BASE FLASHING AT LEAST 3 2. REFER TO MANUFACTURERS'SPECIFICATIONS FOR BASE SUBSTRATE OVERALL THICKNESS TO <br /> INCHES THE REMOVABLE SHEET-METAL COUNTERFLASHING IS NOT REQUIRED. MEMBRANE ATTACHMENT AND PLACEMENT. MATCH INSULATION <br /> SHEET <br /> .7 FLASHING AT WOOD CURB 8 . GUTTER WITH PERIMETER EDGE METAL 9 . GRAVEL STOP ROOF EDGE I i <br />