Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 For mainline planing operations, the equipment shall have automatic controls, with <br /> I2 sensors for either or both sides of the equipment. The controls shall be capable of <br /> 3 sensing the proper grade from an outside reference line, or a mat-referencing device. <br /> 4 The automatic controls shall also be capable of maintaining the desired transverse slope. <br /> I 5 The transverse slope controller shall be capable of maintaining the mandrel at the <br /> 6 desired slope (expressed as a percentage)within plus or minus 0.1 percent. <br /> 7 <br /> 8 Pre-level course is not anticipated on any of the selected streets. If, however, after <br /> 9 plaining operations, drivability issues cannot be resolved with 2" overlay, pre-level will be <br /> 10 required as directed and paid for by "HMA Class 1/2" PG 64-22", per ton. Contractor is <br /> 11 strongly encouraged to bid the work to cover their cost of pre-level operations. <br /> 12 <br /> 13 5-04.3(14)A Paving and Planing Under Traffic <br /> I14 <br /> 15 5-04.3(14)A1 General <br /> I 16 In addition the requirements of Section 1-07.23 and the traffic controls required in <br /> 17 Section 1-10, and unless the Contract specifies otherwise or the Engineer approves, the <br /> 18 Contractor must comply with the following: <br /> I 19 <br /> 20 1. Intersections: <br /> 21 a. Keep intersections open to traffic at all times, except when paving or planing <br /> I 22 operations through an intersection requires closure. Such closure must be kept <br /> 23 to the minimum time required to place and compact the HMA mixture, or plane <br /> 24 as appropriate. For paving, schedule such closure to individual lanes or portions <br /> I 25 thereof that allows the traffic volumes and schedule of traffic volumes required in <br /> 26 the approved traffic control plan. Schedule work so that adjacent intersections <br /> 27 are not impacted at the same time and comply with the traffic control restrictions <br /> 28 required by the Contracting Agency. Each individual intersection closure or <br /> I29 partial closure, must be addressed in the traffic control plan, which must be <br /> 30 submitted to and accepted by the Engineer, see Section 1-10.2(2). <br /> 31 b. When planing or paving and related construction must occur in an <br /> I32 intersection, schedule and sequence such work into quarters of the intersection, <br /> 33 or half or more of an intersection with side street detours unless otherwise <br /> 34 directed by the Engineer. Be prepared to sequence the work to individual lanes <br /> 35 or portions thereof. <br /> 36 c. Allow new compacted HMA asphalt to cool to ambient temperature before <br /> 37 any traffic is allowed on it. Traffic is not allowed on newly placed asphalt until <br /> I38 approval has been obtained from the Engineer. <br /> 39 2. Temporary centerline marking, post-paving temporary marking, temporary stop <br /> 40 bars, and maintaining temporary pavement marking must comply with Section 8- <br /> I 41 23. <br /> 42 3. Permanent pavement marking must comply with Section 8-22. <br /> I 43 <br /> 44 <br /> 45 5-04.3(15) Vacant <br /> I46 <br /> 47 5-04.3(16) HMA Road Approaches <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 69 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />