My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 8-09.4 Measurement <br /> 2 <br /> 3 Section 8-09.4 is supplemented with the following: <br /> 4 <br /> 5 Measurement of markers will be per hundred for markers furnished and in place. <br /> 6 <br /> 7 8-09.5 Payment <br /> 8 <br /> 9 Section 8-09.5 is supplemented with the following: <br /> 10 <br /> 11 Payment will be made in accordance with section 1-04.1, for the following Bid item <br /> 12 included in the Proposal: <br /> 13 <br /> 14 "Raised Pavement Marker Type 2", per hundred. <br /> 15 <br /> 16 <br /> ' 17 GLF 8-13.DOCX <br /> 18 8-13 MONUMENT CASES <br /> 19 <br /> 20 Section 8-13 of the standard specifications is deleted and replaced by the following: <br /> 21 <br /> 22 (******) <br /> 23 8-13.1 Description <br /> 24 <br /> 25 This work will consist of adjusting existing survey monument cases to grade in <br /> 26 accordance with Standard Drawing No. 323 and these Special Provisions. <br /> 27 <br /> 28 8-13.2 Vacant <br /> 29 <br /> 30 8-13.3 Construction Requirements <br /> 31 <br /> 32 Existing monument castings shall be adjusted to grade in the same manner as for <br /> 33 manholes in Section 7-05.3(1) of these Special Provisions. <br /> 34 <br /> 35 8-13.4 Measurement <br /> 36 <br /> 37 Measurement of monument case and cover will be by the unit for each monument case <br /> 38 and cover adjusted to grade. <br /> 39 <br /> 40 8-13.5 Payment <br /> 111 <br /> 41 <br /> 42 Payment will be made for the following bid items when included in the proposal: <br /> 43 <br /> 44 "Adjust Existing Monument Castings to Grade," per each; <br /> 45 <br /> 46 The unit contract price for "Adjust Existing Monument Casing to Grade" shall include all <br /> 47 costs to adjust the casting to finished grade. <br /> 48 <br /> 49 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 75 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.