Laserfiche WebLink
I <br /> 1 also contain a stranded copper drain wire and shall be individually shielded with <br /> I2 an aluminum polyester foil shield. <br /> 3 <br /> 4 8-20.3.GR8 <br /> I 5 Construction Requirements <br /> 6 <br /> 7 8-20.3(6),INSTI.DOCX <br /> I <br /> 8 8-20.3(6)Junction Boxes, Cable Vaults, and Pull Boxes <br /> 9 <br /> 10 Section 8-20.3(6) is supplemented with the following: <br /> I11 <br /> 12 (******) <br /> 13 Where called for in the Plans, Standard Duty concrete junction boxes and cable vault <br /> 14 lid assemblies shall be installed in sidewalks, walkways and shared use paths. The <br /> 15 junction boxes and lid assemblies shall be installed and adjusted to be flush with <br /> I 16 surface and match grade of the sidewalk, walkway and shared use path. Cable vault <br /> 17 lid assemblies shall be installed on existing cable vaults. Any sawcutting or grouting <br /> 18 necessary to adjust the lid assembly to grade is included in the Work. <br /> 19 I <br /> 20 Concrete junction boxes and cable vault lid assemblies will be City supplied. <br /> 21 Concrete junction boxes will have slip resistant surfaces and load bearing rings will <br /> 22 be provided. <br /> I 23 <br /> 24 The Contractor shall adjust existing junction box to new grade in accordance to City <br /> 25 of Everett Standard Drawing 808 and shall be of the type indicated in the plans. The <br /> I 26 adjustment operations shall be conducted to prevent damage to any conduits. All <br /> 27 parts or materials damaged as a result of the Contractor's operations shall be <br /> 28 replaced at no expense to the Contracting Agency. If junction box adjustment <br /> I 29 involves conduit modification, as determined by the Engineer, payment will be made <br /> 30 in accordance with Section 1-09.6. <br /> 31 <br /> I 32 All junction boxes and vaults placed in sidewalk or pedestrian path shall meet a gap <br /> 33 acceptance requirement of no more than 1/2" wide with greater than 1/4" deep <br /> 34 depression. <br /> I 35 <br /> 36 All costs associated with replacing junction boxes or cable vault lid assemblies, <br /> 37 including excavation and installation of junction box load bearing rings, intermediate <br /> 38 and final adjustment to grade, saw cutting or grouting of existing vaults, or other work <br /> I 39 to install the junction box in the sidewalk, shall be included in the associated bid item <br /> 40 for Cement Concrete Sidewalk. <br /> 41 <br /> I 42 <br /> 43 8-20.3(14).GR8 <br /> 44 Signal Systems <br /> I 45 <br /> 46 8-20.3(14),INST1.GR8 <br /> 47 Section 8-20.3(14) is supplemented with the following: <br /> I48 <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 77 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />