Laserfiche WebLink
I <br /> 1 approved materials listed in the Qualified Products List. Temporary flexible raised <br /> 2 pavement markers shall be nailed to the subsurface pavement and removed prior to 111 <br /> 3 paving. Reflectorized aluminum tape shall be used on new pavement and removed <br /> 4 during permanent marking application <br /> 5 <br /> 6 8-23.5 Payment <br /> 7 <br /> 8 Section 8-23.5 is supplemented read as follows: I <br /> 9 <br /> 10 ( ) <br /> 11 Temporary Pavement Marking will be paid for under bid item "Temporary Pavement I <br /> 12 Markings" per linear foot. This shall be full pay for constructing, maintaining, and <br /> 13 removing temporary lines and markers as specified. No additional compensation will be <br /> 14 allowed when Contractor is required to repair temporary markings that have been 111 <br /> 15 damaged or worn. <br /> 16 <br /> 17 GKK 8-26.DOCX <br /> 18 8-26 RESOLVE ABOVE GROUND CONFLICTS <br /> 19 (******) <br /> 20 <br /> 21 Section 8-26 is vacant and is replaced with the following: <br /> 22 <br /> 23 8-26.1 Description , <br /> 24 <br /> 25 This work consists of resolving unanticipated above ground conflicts to conform to the <br /> 26 Project requirements due to construction, where they are not addressed by the I <br /> 27 Construction Plans and Details. This bid item may be used to construct or modify items <br /> 28 which are not identified, nor addressed in the Plans and Details. <br /> 29 <br /> 30 8-26.2 Vacant <br /> 31 <br /> 32 8-26.3 Construction Requirements <br /> 33 <br /> 34 As directed by Engineer, address and resolve underground conflicts that need <br /> 35 modification to accommodate construction. <br /> 36 <br /> 37 8-26.4 Vacant <br /> 38 <br /> 39 8-26.5 Payment <br /> 40 <br /> 41 "Resolved unanticipated conflicts" Force Account, as provided in Section 1-09.6. <br /> 42 <br /> 43 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> 44 amount in the Proposal to become a part of the Contractor's total Bid. <br /> 45 <br /> 46 <br /> 47 END DIVISION8.RTF <br /> 48 <br /> 49 END DIVISION 8 <br /> 1 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 84 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />