My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> BID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> 2021 PAVEMENT MAINTENANCE OVERLAY , <br /> W.O. 3751 <br /> Note: Unit prices for all items,all extensions, and the total amount bid must be shown. Where conflict occurs between the <br /> unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br /> thereto. All entries must be typed or entered in ink. <br /> BIDDER NAME Lakeside Erd#944705roc. ' <br /> The project will include the total of Schedule A plus Schedule H as the Base Bid. The Proposal also <br /> includes Bid Additive Schedule B, Schedule C, Schedule D, Schedule E, Schedule F, and Schedule G. <br /> For identical items on Schedules A through H,the cost per unit shall be equal or equivalent by scale, <br /> as determined by the City.The project will be awarded to the lowest responsible Bidder based on the <br /> total sum of the Base Bid (Schedules A and H) plus the total of the selected Bid Additives. The <br /> decision to which Bid Additives are selected is at the City's sole discretion and will be made after Bid <br /> opening. <br /> t <br /> I <br /> 1 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 2 OF 35 DIVISION P <br /> WORK ORDER 3751 MARCH 29,2021 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.