My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT I <br /> ITEM DESCRIPTION <br /> NO. QUANITITY <br /> (FIGURES) (FIGURES) <br /> 9. 65,489 Planing Bituminous $ 3 . 30 $ 21(p/ Ili . 70 I <br /> Square Yard Pavement (2" Deep) Per S.Y. <br /> 10. 9,823 Additional Planing $ 0 . I6 $ Ir Et ? 3 , yr' I <br /> Square Yard Bituminous Pavement Per S.Y. <br /> 11. 8,205 Vehicle Loop Detectors $ if • 5-0 $ 15-1 7 yZ • ,f'O I <br /> Linear Foot Per L.F. <br /> 12. 1,970 Loop Lead-In Detector Cable $ 7 . SO $ ( Y 77S- . 00 I <br /> Linear Foot Per L.F. <br /> 13. 185 Conduit Pipe, 2" Diameter $ 1 i . 00 $ 2 035 . Od I <br /> Linear Foot Per L.F. <br /> 14. 79,962 Temporary Pavement $ 0 . 5- T $ y3 f 7f, . /D <br /> Linear Foot Markings Per L.F. / <br /> 15. 1,056 Plastic Wide Line $ 3 .Zr- $ 3 a/32 . 00 I <br /> Linear Foot Per L.F. <br /> 16. 47 Plastic Traffic Arrow $ I `/r . 7 O $ 68 <br /> ?9 . 90 I <br /> Each Per Each <br /> 2,060Z I <br /> 17. <br /> 24" Plastic Crosswalk Line $ /(� • 3r $ Z 3 Oy <br /> Linear Foot Per L.F. �— <br /> I <br /> 18. 688 24" Plastic Stop Bar $ (0 . 990 $ 7 y y 9 . Zy <br /> Linear Foot Per L.F. I <br /> 19. 1,517 Paint Line $ 0 . 80 $ / 2/3 . 60 <br /> Linear Foot Per L.F. I <br /> 20. 45,507 Plastic Line $ ( . sr $ G / coy . Y — <br /> Linear Foot Per L.F. I <br /> 21. 12 Plastic Traffic Letter $ 5-0 . g-a $ 606 • 00 <br /> Each Per Each I <br /> I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE A DIVISION P I <br /> WORK ORDER 3751 MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.