My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,I <br /> 1 ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I 9. 40,618 Planing Bituminous $ 3d $ /3y 03? tie <br /> Yard Pavement (2" Deep) Per S.Y. <br /> I <br /> 10. 6,093 Additional Planing $ 0 • /� $ /l� �� <br /> Square Yard Bituminous Pavement Per S.Y. <br /> I <br /> 11. 0 Vehicle Loop Detectors $ 0 • 00 $ 0 • 00 <br /> Linear Foot'; Per L.F. <br /> I12. 0 Loop Lead-In Detector Cable $ 0 • 00 $ 0 00 <br /> Linear Foot Per L.F. <br /> I Conduit Pipe,2 <br /> 13. 0 " Diameter $ 0 00 $ 0 • 00 <br /> Linear Foot Per L.F. <br /> I 14. 16,352 Tem orar Pavement � O <br /> p Y $ 0 �� U, <br /> Linear Foot Markings Per L.F. <br /> ' 15. 826 � $ Z/ b8Y . <br /> Plastic Wide Line $ 3 . 25 ,tea <br /> ILinear Foot Per L.F. , <br /> 16. 3 Plastic Traffic Arrow $ �Lie • 70 $ yy� . /0 <br /> IEach Per Each <br /> 17. 250 24" Plastic Crosswalk Line $ /0 . 36' $ z SS 7 . so <br /> ILinear Foot Per L.F. <br /> 18. 176 24" Plastic Stop Bar $ /0 • 941 $ �, ?le . Y0 <br /> Linear Foot Per L.F. <br /> 19. 0 Paint Line $ 0 •©0 $ 0 • 00 <br /> ILinear Foot Per L.F. <br /> 20. 11,198 Plastic Line $ / 35' $ /_L. 30 <br /> Linear Foot Per L.F. <br /> I <br /> 21. 0 Plastic Traffic Letter $ 0 . 00 $ 0 03 <br /> Each Per Each <br /> I <br /> I <br /> I 2021 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3751 SCHEDULE B DIVISION P <br /> MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.