My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 BID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> 111 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY <br /> W.O. 3751 <br /> 111 Note: Unit prices for all items, all extensions,and the total amount bid must be shown. Where conflict occurs between <br /> the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> I conform thereto. All entries must be typed or entered in ink. <br /> BIDDER NAME L.alkes(Ole ladus/Hes, Z9c. <br /> IBID ADDITIVE <br /> THIS SCHEDULE WILL BE AWARDED BASED ON ADEQUATE FUNDING <br /> ISCHEDULE E - BEVERLY LANE <br /> ITEM PIAN AMOUNT TOTAL AMOUNT <br /> 1 NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 1. 1 Mobilization $ / 0 0 00 $ �rO0 . BO <br /> ILump Sum Per L.S. <br /> 2. 451 Flaggers(Minimum Bid $ 63 . 0 0 $ Z b if3 . U 0 <br /> IHour Prevailing Wage) Per Hour <br /> 3. 1 Project Temporary Traffic $ 9 COO . e d $ b 0 00 • Oy <br /> ILump Sum Control Per LDS. <br /> 4. 1,338 HMA Class 1/2 Inch,PG 64- $ 80 • �0 $ a7 00 a <br /> Ton 22 Per Ton <br /> IS. 23 Adjust Manhole to Grade $ 5---0 • 0 0 $ l l c0 co <br /> Each Per Each <br /> ' 6. 5 Adjust Catch Basin/Inlet to $ ,S 0 . O 0 $ 2 5-0 . 00 <br /> Each Grade Per Each <br /> 1 7. 22 Adjust Valve Box to Grade $ 5 a . 0 0 $ /,/0 0 . a0 <br /> Each Per Each <br /> 1 8. 4 Adjust Existing Monument $ 5-0 . 0 0 $ 20 d • 0 0 <br /> Each Castings to Grade Per Each <br /> I <br /> I <br /> I 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE E DIVISION P <br /> WORK ORDER 3751 ADDENDUM 2 APRIL 9, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.