My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I , <br /> IITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY (FIGURES) (FIGURES) <br /> I9. 10,695 Planing Bituminous $ 3 • 30 $ 35- 293 . 50 <br /> Square Yard Pavement(2" Deep) Per S.Y. <br /> I . /5 $ ZK 0 . 60 <br /> 10. 1,604 Additional Planing $ O <br /> Square Yard Bituminous Pavement Per S.Y. <br /> I11. 1,175 Vehicle Loop Detectors $ /6 • 5 . $ T I 7,77 . S D <br /> Linear Foot Per L.F. <br /> 1 12. 0 Loop Lead-In Detector Cable $ 0 • Oa $ 0 • 000 <br /> Linear Foot Per L.F. <br /> I13. 0 Conduit Pipe,2" Diameter $ 0 • 00 $ 0 • 00 <br /> Linear Foot Per L.F. <br /> I14. 13,700 Temporary Pavement $ [) . S5 $ '2 s -,3S • GO <br /> Linear Foot Markings Per L.F. <br /> I15. 372 Plastic Wide Line $ 3 . 2,) $ I 2 °7 . too <br /> Linear Foot Per L.F. <br /> I16. 14 Plastic Traffic Arrow $ I `i 8 . 70 $ 2 O 8 / . 8 0 <br /> Each Per Each <br /> I24" /0 . 3S $ 662y . ©o <br /> 17. 640 Plastic Crosswalk Line $ <br /> Linear Foot Per L.F. <br /> I <br /> 18. 128 24" Plastic Stop Bar $ /0 . 9 o $ / 54,E . Z C <br /> ILinear Foot Per L.F. <br /> 19. 0 Paint Line $ 0` • 00 $ 0 • 00 <br /> I <br /> Linear Foot Per L.F.20. 6,203 Plastic Line $ / 3,5°— $ g37 / . 05 <br /> ILinear Foot Per L.F. <br /> 21. 0 Plastic Traffic Letter $ 0 • 00 $ 0 • 00 <br /> Each Per Each <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE H DIVISION P <br /> WORK ORDER 3751 MARCH 29, 2021 <br /> flovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.