Laserfiche WebLink
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 9. 10,917 Planing Bituminous $ . $ <br /> Square Yard Pavement (2" Deep) Per S.Y. <br /> 10. 1,638 Additional Planing $ $ . I <br /> Square Yard Bituminous Pavement Per S.Y. <br /> 11. 0 Vehicle Loop Detectors $ $ II Linear Foot Per L.F. <br /> 12. 0 Loop Lead-In Detector Cable $ $ • <br /> Linear Foot Per L.F. <br /> 13. 0 Conduit Pipe, 2" Diameter $ • $ I <br /> Linear Foot Per L.F. <br /> 14. 7,216 Temporary Pavement $ $ III <br /> Linear Foot Markings Per L.F. <br /> 15. 25 Plastic Wide Line $ • $ i <br /> Linear Foot Per L.F. <br /> I <br /> 16. 1 Plastic Traffic Arrow $ $ <br /> Each Per Each ' <br /> 17. 0 24" Plastic Crosswalk Line $ • $ . <br /> Linear Foot Per L.F. <br /> 18. 0 24" Plastic Stop Bar $ • $ . <br /> Linear Foot Per L.F. <br /> 19. 0 Paint Line $ • $ . <br /> Linear Foot Per L.F. I <br /> 20. 5,959 Plastic Line $ • $ <br /> • <br /> Linear Foot Per L.F. <br /> 21. 0 Plastic Traffic Letter $ • $ • <br /> Each Per Each <br /> I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE E DIVISION P <br /> WORK ORDER 3751 ADDENDUM 2 APRIL 9, 2021 <br />