My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 9. 10,917 Planing Bituminous $ . $ <br /> Square Yard Pavement (2" Deep) Per S.Y. <br /> 10. 1,638 Additional Planing $ $ . I <br /> Square Yard Bituminous Pavement Per S.Y. <br /> 11. 0 Vehicle Loop Detectors $ $ II Linear Foot Per L.F. <br /> 12. 0 Loop Lead-In Detector Cable $ $ • <br /> Linear Foot Per L.F. <br /> 13. 0 Conduit Pipe, 2" Diameter $ • $ I <br /> Linear Foot Per L.F. <br /> 14. 7,216 Temporary Pavement $ $ III <br /> Linear Foot Markings Per L.F. <br /> 15. 25 Plastic Wide Line $ • $ i <br /> Linear Foot Per L.F. <br /> I <br /> 16. 1 Plastic Traffic Arrow $ $ <br /> Each Per Each ' <br /> 17. 0 24" Plastic Crosswalk Line $ • $ . <br /> Linear Foot Per L.F. <br /> 18. 0 24" Plastic Stop Bar $ • $ . <br /> Linear Foot Per L.F. <br /> 19. 0 Paint Line $ • $ . <br /> Linear Foot Per L.F. I <br /> 20. 5,959 Plastic Line $ • $ <br /> • <br /> Linear Foot Per L.F. <br /> 21. 0 Plastic Traffic Letter $ • $ • <br /> Each Per Each <br /> I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY SCHEDULE E DIVISION P <br /> WORK ORDER 3751 ADDENDUM 2 APRIL 9, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.