My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I <br /> ITEM DESCRIPTION YES NO <br /> I <br /> 42. Traffic Signs - Prior to approval of a Fabricator of Traffic Signs, <br /> the sources of the following materials must be submitted and <br /> approved for reflective sheeting, legend material, and <br /> aluminum X <br /> sheeting. <br /> NOTE: *** Fabrication inspection required. Only signs tagged <br /> "Fabrication Approved" by WSDOT Sign Fabrication Inspector <br /> to be installed <br /> 1 Custom Std <br /> Message Signing <br /> Message <br /> 43. Cutting & bending reinforcing steel X <br /> 44. Guardrail components X X <br /> Custom Standard <br /> End Sec Sec <br /> 45. Aggregates/Concrete mixes Covered by <br /> WAC 296-127-018 <br /> 46. Asphalt Covered by <br /> WAC 296-127-018 <br /> 47. Fiber fabrics X <br /> 48. Electrical wiring/components X <br /> 49. treated or untreated timber pile <br /> 50. Girder pads (elastomeric bearing) <br /> X <br /> ' 51. Standard Dimension lumber X <br /> 52. Irrigation components X <br /> I <br /> 1 <br /> i <br /> I <br /> I <br /> Supplemental to Wage Rates 7 <br /> 03/04/2021 Edition, Published February 3, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.