My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snohomish Pile Driver Hyperbaric Worker- $104.26 7A 4C View ' I <br /> Compressed Air Worker <br /> 68.01 - 70.00 PSI I <br /> Snohomish Pile Driver Hyperbaric Worker- $106.26 7A 4C View <br /> Compressed Air Worker <br /> 70.01 - 72.00 PSI I <br /> Snohomish Pile Driver Hyperbaric Worker - $108.26 7A 4C View <br /> Compressed Air Worker <br /> 72.01 - 74.00 PSI <br /> Snohomish Pile Driver Journey Level $65.19 7A 4C View <br /> Snohomish Plasterers Journey Level $61.67 7Q 1R View <br /> Snohomish Playground & Park Journey Level $13.69 1 View <br /> Equipment Installers <br /> Snohomish Plumbers Et Pipefitters Journey Level $79.47 5A 1G View <br /> Snohomish Power Equipment Operators Asphalt Plant Operators $73.49 7A 3K 8X View <br /> Snohomish Power Equipment Operators Assistant Engineer $69.12 7A 3K 8X View <br /> Snohomish Power Equipment Operators Barrier Machine (zipper) $72.84 7A 3K 8X View <br /> Snohomish Power Equipment Operators Batch Plant Operator: $72.84 7A 3K 8X View <br /> concrete <br /> Snohomish Power Equipment Operators Bobcat $69.12 7A 3K 8X View <br /> Snohomish Power Equipment Operators Brokk - Remote $69.12 7A 3K 8X View I <br /> Demolition Equipment <br /> Snohomish Power Equipment Operators Brooms $69.12 7A 3K 8X View <br /> Snohomish Power Equipment Operators Bump Cutter $72.84 7A 3K 8X View I <br /> Snohomish Power Equipment Operators Cableways $73.49 7A 3K 8X View <br /> Snohomish Power Equipment Operators Chipper $72.84 7A 3K 8X View <br /> Snohomish Power Equipment Operators Compressor $69.12 7A 3K 8X View <br /> Snohomish Power Equipment Operators Concrete Finish Machine - $69.12 7A 3K 8X View <br /> Laser Screed <br /> Snohomish Power Equipment Operators Concrete Pump - Mounted $72.28 7A 3K 8X View I <br /> Or Trailer High Pressure <br /> Line Pump, Pump High <br /> Pressure <br /> Snohomish Power Equipment Operators Concrete Pump: Truck $73.49 7A 3K 8X View <br /> Mount With Boom <br /> Attachment Over 42 M <br /> Snohomish Power Equipment Operators Concrete Pump: Truck $72.84 7A 3K 8X View <br /> Mount With Boom <br /> Attachment Up To 42m <br /> Snohomish Power Equipment Operators Conveyors $72.28 7A 3K 8X View <br /> Snohomish Power Equipment Operators Cranes friction: 200 tons $75.72 7A 3K 8X View <br /> and over IISnohomish Power Equipment Operators Cranes: 100 tons through $74.22 7A 3K 8X View <br /> 199 tons, or 150' of boom <br /> (including jib with <br /> attachments) I <br /> Snohomish Power Equipment Operators Cranes: 20 Tons Through $72.84 7A 3K 8X View <br /> 44 Tons With Attachments <br /> Snohomish Power Equipment Operators Cranes: 200 tons- 299 $74.99 7A 3K 8X View I <br /> tons, or 250'of boom <br /> including jib with <br /> attachments <br /> Snohomish Power Equipment Operators Cranes: 300 tons and over $75.72 7A 3K 8X View <br /> or 300'of boom including <br /> jib with attachments I <br />
The URL can be used to link to this page
Your browser does not support the video tag.