My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISnohomish Power Equipment Overhead, Bridge Type: $73.49 7A 3K 8X View <br /> Operators- Underground 45 Tons Through 99 Tons <br /> I Sewer & Water <br /> Snohomish Power Equipment Pavement Breaker $69.12 7A 3K 8X View <br /> Operators- Underground <br /> Sewer Et Water <br /> ISnohomish Power Equipment Pile Driver (other Than $72.84 7A 3K 8X View <br /> Operators- Underground Crane Mount) <br /> Sewer Et Water <br /> ISnohomish Power Equipment Plant Oiler Asphalt, $72.28 7A 3K 8X View <br /> Operators- Underground Crusher <br /> Sewer Et Water <br /> I Snohomish Power Equipment Posthole Digger, $69.12 7A 3K 8X View <br /> Operators- Underground Mechanical <br /> Sewer & Water <br /> I Snohomish Power Equipment Power Plant $69.12 7A 3K 8X View <br /> Operators- Underground <br /> Sewer & Water <br /> I Snohomish Power Equipment Pumps Water $69.12 7A 3K 8X View <br /> Operators- Underground <br /> Sewer Et Water <br /> Snohomish Power Equipment Quad 9, Hd 41, D10 And $73.49 7A 3K 8X View <br /> I <br /> Operators- Underground Over <br /> Sewer Et Water <br /> Snohomish Power Equipment Quick Tower - No Cab, $69.12 7A 3K 8X View <br /> I Operators- Underground Sewer & Water Under 100 Feet In Height <br /> Based To Boom <br /> Snohomish Power Equipment Remote Control Operator $73.49 7A 3K 8X View <br /> I Operators- Underground Sewer Et Water On Rubber Tired Earth <br /> Moving Equipment <br /> Snohomish Power Equipment Rigger and Beliman $69.12 7A 3K 8X View <br /> I Operators- Underground <br /> Sewer Et Water <br /> Snohomish Power Equipment Rigger/Signal Person, $72.28 7A 3K 8X View <br /> Operators- Underground Beliman (Certified) <br /> ISewer Et Water <br /> Snohomish Power Equipment Rollagon $73.49 7A 3K 8X View <br /> Operators- Underground <br /> 1 Sewer &Water <br /> Snohomish Power Equipment Roller, Other Than Plant $69.12 7A 3K 8X View <br /> Operators- Underground Mix <br /> I Sewer E Water <br /> Snohomish Power Equipment Roller, Plant Mix Or Multi- $72.28 7A 3K 8X View <br /> Operators- Underground lift Materials <br /> Sewer EtWater <br /> I <br /> Snohomish Power Equipment Roto-mill, Roto-grinder $72.84 7A 3K 8X View <br /> Operators- Underground <br /> Sewer E Water <br /> I Snohomish Power Equipment Saws Concrete $72.28 7A 3K 8X View <br /> Operators- Underground <br /> Sewer E Water <br /> I Snohomish Power Equipment Scraper, Self Propelled $72.84 7A 3K 8X View <br /> Operators- Underground Under 45 Yards <br /> Sewer E Water <br /> I Snohomish Power Equipment Scrapers Concrete & $72.28 7A 3K 8X View <br /> Operators- Underground Carry All <br /> Sewer E Water <br /> Snohomish Power Equipment Scrapers, Self-propelled: $73.49 7A 3K 8X View <br />
The URL can be used to link to this page
Your browser does not support the video tag.