Laserfiche WebLink
I <br /> EVERETT <br /> WASHINGTON Everett Noise Administrator's Office <br /> I <br /> December 11, 2020 <br /> Cityof Everett Public Works Department <br /> p <br /> I Gael Fisk <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: Hot Mix Asphalt Overlay 2021 Project Night Noise Variance <br /> Dear Ms. Fisk: <br /> The City grants a variance to the noise ordinance, EMC 20.08,for the 2021 HMA Overlay work. In order <br /> to minimize traffic impacts during commute hours,this work must be performed at night.The variance <br /> 1 allows nighttime work at the following locations: <br /> Evergreen Way E Casino Road to Holly Drive <br /> Broadway 15th to 18th Street <br /> W/E Casino Road Sth Avenue W to Evergreen Way <br /> Pecks Drive Evergreen Way to Beverly Lane(Early Start Only) <br /> 52nd Street SE Broadway to South 2nd Avenue (Early Start Only) <br /> The variance allows for up to 30 days of nighttime work between 10 pm and 7 am at each location <br /> during the construction window of May 11—October 30, 2021.This variance applies to the contractor <br /> and subcontractors selected by the City of Everett for this project. To minimize impacts on residential <br /> and business properties,the following mitigation measures shall be in effect: <br /> • Back-up alarms shall be directional broad band type alarms <br /> • Trucks performing export haul shall have well maintained bed liners <br /> • No construction work will be allowed between 6 pm and 8 am on Saturdays,Sundays or <br /> federally recognized holidays <br /> Should you wish to extend this variance please submit a renewal request prior to expiration of this <br /> variance. <br /> Sincerely, <br /> a rill iim-n <br /> Megan Munro <br /> City of Everett Noise Administrator <br /> cc: Kimberly Cline,Administration Kathleen Baxter, Public Works PIO <br /> I <br /> • 2930 Wetmore Ave Suite 5A• Everett,WA 98201 •425-257-8775 <br />