My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Project: <br /> Change Order No. <br /> Change Order Effective Date: <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractuallyscheduled completion date, shall be <br /> p <br /> adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timelyand properly follows the procedures in the contract for <br /> p P Y <br /> seeking further equitable adjustment of time and compensation, including, but not <br /> limited to, delays, impacts, inefficiencies, overhead, and direct and indirect costs, and <br /> except as otherwise expressly provided herein, the Contractor will be barred from (a) <br /> asserting any claim for further adjustment of time and compensation arising out of, or <br /> relating to, the charges described in this Change Order or work described in Exhibit A <br /> and (b) asserting an equitable adjustment of time or price arising earlier than the date <br /> of this Change Order. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest, dispute, claim or Contract Claim as required by the <br /> Contract Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after the <br /> date of this Change Order, but relates to work performed prior to the date of this <br /> Change Order, then this provision does not apply if the Contractor timely and properly <br /> submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> I <br /> CITY <br /> Attest: Approved As to Foiui: <br /> I <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Manager Department Director <br /> Manager(if applicable) (if applicable) <br /> applicable) <br /> I <br /> Date: <br /> Date: _ Date: Date: <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.