Laserfiche WebLink
I <br /> INSTRUCTIONS TO BIDDERS <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention of Gael <br /> Fisk, P.E., (425) 257 — 8909 or gfisk@everettwa.gov. <br /> 1 2.0 Bid Schedules <br /> This project includes 8 bid schedules, which are incorporated into the Proposal. Bid schedules are <br /> defined as follows: <br /> • Schedule A <br /> Evergreen Way— E Casino Rd To Holly Dr <br /> Broadway— 15th St To 18th St <br /> Casino Rd — 5th Ave W To Evergreen Way <br /> Pecks Dr— Evergreen Way To Beverly Ln <br /> • Schedule B <br /> 1 • <br /> Wetmore Ave - Alverson Blvd To 11th Street Seg (Except 7th — 10th) <br /> Colby Ave - Alverson Blvd To 10th St <br /> 5th St - Wetmore Ave To Colby Ave <br /> 6th St- Wetmore Ave To Colby Ave <br /> 7th St- Wetmore Ave To Colby Ave <br /> 8th St- Wetmore Ave To Colby Ave <br /> 9th St- Wetmore Ave To Colby Ave <br /> Alverson Blvd - Maulsby Ln To Rockefeller Ave <br /> Grand Ave - Alverson To 10th <br /> Rockefeller Ave - 5th St To Alverson Blvd <br /> • Schedule C <br /> Wetmore Ave Intersections —5th St, 6th St, 11th St <br /> • Schedule D <br /> Lowell Rd - Broadway To S 2nd Ave <br /> • Schedule E <br /> Beverly Ln - Pecks Dr To Sunset Ln <br /> • Schedule F <br /> 33rd Ave W - 54th St SW To 52nd PI SW <br /> ' 52nd St SE - Ocean Ave To 33rd Ave W <br /> • Schedule G <br /> 3702 Colby Ave Alley <br /> 3701 Colby Ave Alley <br /> 3601 Colby Ave Alley <br /> 2901 Colby Ave Alley <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 1 OF 3 DIVISION B <br /> WORK ORDER 3751 MARCH 29,2021 <br /> 1 <br />