My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 CONTENTS <br /> 111 2 <br /> 3 INTRODUCTION TO THE SPECIAL PROVISIONS 1 <br /> 4 <br /> 5 DIVISION 1 <br /> 6 GENERAL REQUIREMENTS <br /> 7 DESCRIPTION OF WORK 2 <br /> I 8 1-01 DEFINITION AND TERMS 2 <br /> 9 1-01.3 Definitions 2 <br /> 10 1-02 BID PROCEDURES AND CONDITIONS 4 <br /> I11 1-02.1 Qualification of Bidder 4 <br /> 12 1-02.2 Plans and Specifications 4 <br /> 1 13 1-02.5 Proposal Forms 5 <br /> 14 1-02.6 Preparation of Proposal 5 <br /> I15 1-02.6(1) Recycled Materials Proposal 7 <br /> 16 1-02.7 Bid Deposit 7 <br /> I17 1-02.9 Delivery of Proposal 8 <br /> 18 1-02.10 Withdrawing, Revising, or Supplementing Proposal 8 <br /> I 19 1-02.13 Irregular Proposals 9 <br /> 20 1-02.14 Disqualification of Bidders 10 <br /> I 21 1-02.15 Pre Award Information 11 <br /> 22 1-03 AWARD AND EXECUTION OF CONTRACT 11 <br /> 23 1-03.1 Consideration of Bids 11 <br /> I24 1-03.1(1) Identical Bid Totals 11 <br /> 25 1-03.3 Execution of Contract 12 <br /> 1 26 1-03.4 Contract Bond 12 <br /> 27 1-03.7 Judicial Review 13 <br /> III <br /> 28 1-04 SCOPE OF WORK 13 <br /> 29 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 30 Specifications, and Addenda 13 <br /> I 31 1-05 CONTROL OF WORK 13 <br /> 32 1-05.7 Removal of Defective and Unauthorized Work 14 <br /> 1 33 1-05.11 Final Inspections and Operational Testing 14 <br /> 34 1-05.11(1) Substantial Completion Date 14 <br /> 1 35 1-05.11(2) Final Inspection And Physical Completion Date 15 <br /> 36 1-05.11(3) Operational Testing 15 <br /> I37 1-05.13 Superintendents, Labor and Equipment of Contractor 16 <br /> I 2021 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3751 PAGE A OF G SPECIAL PROVISIONS <br /> MARCH 29, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.