My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-08.4 Notice to Proceed and Prosecution of Work 34 <br /> I2 1-08.5 Time for Completion 35 <br /> 3 1-08.9 Liquidated Damages 36 <br /> 1 4 1-09 MEASUREMENT AND PAYMENT 36 <br /> 5 1-09.6 Force Account 36 <br /> II6 1-09.6 Payment For Material On Hand 36 <br /> 7 1-09.9 Payments 37 <br /> I8 1-09.9(1) Retainage - Vacant 38 <br /> 9 1-10 TEMPORARY TRAFFIC CONTROL 38 <br /> I 10 1-10.2 Traffic Control Management 38 <br /> 11 1-10.2(1)General 38 <br /> I 12 1-10.3 Traffic Control, Labor, Procedures and Devices 38 <br /> 13 1-10.3(1)Traffic Control Labor 38 <br /> 14 1-010.3(1)C Uniformed Police Officer 39 <br /> 1 15 1-10.4 Measurement 39 <br /> 16 1-10.4(3) Reinstating Unit Items With Lump Sum Traffic Control 39 <br /> 17 1-10.5 Payment 40 <br /> 18 1-10.5(2) Item Bids with Lump Sum for Incidentals 40 <br /> I19 <br /> 20 DIVISION 2 <br /> I21 EARTHWORK <br /> 22 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 41 <br /> I 23 2-02.3 Construction Requirements 41 <br /> 24 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters 41 <br /> 25 2-02.3(3)A Removal of Cement Concrete Sidewalks 41 <br /> I26 2-02.3(3)B Temporary Asphalt Concrete Sidewalk 42 <br /> 27 2-02.3(3)C Sawcut Asphalt Concrete Pavement 42 <br /> 1 28 2-02.4 Measurement 42 <br /> 29 2-02.5 Payment 42 <br /> 1 30 2-08 STREET CLEANING 42 <br /> 31 2-08.1 Description 43 <br /> I32 2-08.2 Vacant 43 <br /> 33 2-08.3 Construction Requirements 43 <br /> I 34 2-08.4 Measurement 43 <br /> 35 2-08.5 Payment 43 <br /> I 36 <br /> 37 <br /> I 2021 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3751 PAGE C OF G SPECIAL PROVISIONS <br /> MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.