My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 A bid by a joint venture shall be executed in the joint venture name and signed by a <br /> 2 member of the joint venture. A copy of the joint venture agreement shall be submitted ' <br /> 3 with the Bid Form if any UDBE requirements are to be satisfied through such an <br /> 4 agreement. <br /> 6 *** I <br /> , <br /> 7 Section 1-02.6 is supplemented with the following: <br /> 8 <br /> 9 Additive Bids <br /> 10 <br /> 11 This Bid Proposal is composed of the following parts: <br /> 12 1. Base Bid111 <br /> 13 The Total Bid shall include constructing all items included in the Proposal <br /> 14 Schedule noted below, except those items contained in the Additives Schedule B, <br /> 15 Schedule C, Schedule D, Schedule E, Schedule, F, and Schedule G. , <br /> 16 <br /> 17 • Schedule A <br /> 18 Evergreen Way— E Casino Rd To Holly Dr I <br /> 19 Broadway— 15th St To 18th St <br /> 20 Casino Rd —5th Ave W To Evergreen Way <br /> 21 Pecks Dr— Evergreen Way To Beverly Ln I <br /> 22 • Schedule H <br /> 23 Colby Ave— 37th St To 40th St <br /> 24 <br /> 25 2. Additive(s) Schedule B and C <br /> 26 <br /> 27 • Schedule B I <br /> 28 Wetmore Ave - Alverson Blvd To 11th Street Seg (Except 7th — 10th) <br /> 29 Colby Ave - Alverson Blvd To 10th St <br /> 30 5th St- Wetmore Ave To Colby Ave <br /> 31 6th St- Wetmore Ave To Colby Ave <br /> 32 7th St - Wetmore Ave To Colby Ave <br /> 33 8th St-Wetmore Ave To Colby Ave <br /> 34 9th St- Wetmore Ave To Colby Ave <br /> 35 Alverson Blvd - Maulsby Ln To Rockefeller Ave <br /> 36 Grand Ave - Alverson To 10th <br /> 37 Rockefeller Ave - 5th St To Alverson Blvd I <br /> 38 <br /> 39 • Schedule C <br /> 40 Wetmore Ave Intersections— 5th St, 6th St, 11th St <br /> 41 <br /> 42 3. Additive(s) Schedule D <br /> 43 I <br /> 44 • Schedule D <br /> 45 Lowell Rd - Broadway To S 2nd Ave <br /> 46 I 47 4. Additive(s) Schedule E <br /> 48 <br /> 49 • Schedule E <br /> 50 Beverly Ln - Pecks Dr To Sunset Ln <br /> 51 <br /> 52 5. Additive(s) Schedule F <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 6 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.