My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 6. The signature of the surety's officer empowered to sign the bond and the power of <br /> 2 attorney. I <br /> 3 <br /> 4 If so stated in the Contract Provisions, bidder must use the bond form included in the <br /> 5 Contract Provisions. <br /> 6 <br /> 7 If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. <br /> 8 <br /> 9 1-02.9.OptionA.RTF <br /> 10 1-02.9 Delivery of Proposal <br /> 11 (October 1, 2020 APWA GSP, Option A) I <br /> 12 <br /> 13 Delete this section and replace it with the following: <br /> 14 I <br /> 15 Each Proposal shall be submitted in a sealed envelope, with the Project Name and <br /> 16 Project Number as stated in the Call for Bids clearly marked on the outside of the <br /> 17 envelope, or as otherwise required in the Bid Documents, to ensure proper handling and <br /> 18 delivery. I <br /> 19 <br /> 20 To be considered responsive on a FHWA-funded project, the Bidder may be required to <br /> 21 submit the following items, as required by Section 1-02.6: <br /> 22 <br /> 23 • DBE Written Confirmation Document from each DBE firm listed on the Bidder's <br /> 24 completed DBE Utilization Certification (WSDOT 272-056) <br /> 25 • Good Faith Effort (GFE) Documentation <br /> 26 • DBE Bid Item Breakdown (WSDOT 272-054) <br /> 27 • DBE Trucking Credit Form (WSDOT 272-058) , <br /> 28 <br /> 29 These documents, if applicable, shall be received either with the Bid Proposal or as a <br /> 30 supplement to the Bid. These documents shall be received no later than 48 hours (not I <br /> 31 including Saturdays, Sundays and Holidays) after the time for delivery of the Bid <br /> 32 Proposal. <br /> 33 <br /> 34 If submitted after the Bid Proposal is due, the document(s) must be submitted in a sealed <br /> 35 envelope labeled the same as for the Proposal, with "Supplemental Information" added. <br /> 36 All other information required to be submitted with the Bid Proposal must be submitted <br /> 37 with the Bid Proposal itself, at the time stated in the Call for Bids. I <br /> 38 <br /> 39 Proposals that are received as required will be publicly opened and read as specified in <br /> 40 Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that <br /> 41 is received after the time specified in the Call for Bids for receipt of Bid Proposals, or <br /> 42 received in a location other than that specified in the Call for Bids. The Contracting <br /> 43 Agency will not open or consider any "Supplemental Information" (DBE confirmations, or I <br /> 44 GFE documentation) that is received after the time specified above, or received in a <br /> 45 location other than that specified in the Call for Bids. <br /> 46 I 47 If an emergency or unanticipated event interrupts normal work processes of the <br /> 48 Contracting Agency so that Proposals cannot be received at the office designated for <br /> 49 receipt of bids as specified in Section 1-02.12 the time specified for receipt of the I <br /> 50 Proposal will be deemed to be extended to the same time of day specified in the <br /> 51 solicitation on the first work day on which the normal work processes of the Contracting <br /> 52 Agency resume. <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 8 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.