Laserfiche WebLink
1 1-02.15.RTF <br /> .. _ <br /> 2 1-02.15 Pre Award Information <br /> 3 (August 14, 2013 APWA GSP) <br /> 4 <br /> ' 5 Revise this section to read: <br /> 6 <br /> 7 Before awarding any contract, the Contracting Agency may require one or more of these <br /> ' 8 items or actions of the apparent lowest responsible bidder: <br /> 9 1. A complete statement of the origin, composition, and manufacture of any or all <br /> 10 materials to be used, <br /> ' 11 2. Samples of these materials for quality and fitness tests, <br /> 12 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 13 of and time required for the various phases of the work, <br /> 14 4. A breakdown of costs assigned to any bid item, <br /> 15 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 16 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> ' 17 where the work is located. <br /> 18 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 19 bidder is the lowest responsible bidder. <br /> ' 20 <br /> 21 <br /> 22 1-03.G R1 <br /> ' 23 Award and Execution of Contract <br /> 24 <br /> 25 1-03.1.DOCX <br /> 26 1-03.1 Consideration of Bids <br /> 27 <br /> 28 1-03.1(1).RTF <br /> ' 29 1-03.1(1) Identical Bid Totals <br /> 30 (January 4, 2016 APWA GSP) <br /> 31 <br /> 32 Revise this section to read: <br /> 33 <br /> 34 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 35 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 36 highest percentage of recycled materials in the Project, per the form submitted with the <br /> 37 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 38 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 39 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 40 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 41 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> ' 42 alphabetic order by the name of the firm as registered with the Washington State <br /> 43 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 44 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> ' 45 46 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal <br /> 47 to the highest proposed recycled materials amount, are eligible to draw. <br /> 48 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 11 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />