My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 completion. The Engineer may also establish the Substantial Completion Date <br /> 2 unilaterally. <br /> 3 <br /> 4 If, after this inspection, the Engineer concurs with the Contractor that the work is <br /> ' 5 substantially complete and ready for its intended use, the Engineer, by written notice to <br /> 6 the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> 7 Engineer does not consider the work substantially complete and ready for its intended <br /> I 8 use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> 9 therefor. <br /> 10 <br /> Ii 1 Upon receipt of written notice concurring in or denying substantial completion, whichever <br /> 12 is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized <br /> 13 interruption, the work necessary to reach Substantial and Physical Completion. The <br /> I <br /> 14 15 Contractor shall provide the Engineer with a revised schedule indicating when the <br /> Contractor expects to reach substantial and physical completion of the work. <br /> 16 <br /> 17 The above process shall be repeated until the Engineer establishes the Substantial <br /> I <br /> 18 Completion Date and the Contractor considers the work physically complete and ready for <br /> 19 final inspection. <br /> 20 <br /> I <br /> 21 1-05.11(2) Final Inspection and Physical Completion Date <br /> 22 <br /> 23 When the Contractor considers the work physically complete and ready for final <br /> I <br /> 24 25 inspection, the Contractor by written notice, shall request the Engineer to schedule a <br /> final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> 26 Contractor will then make a final inspection and the Engineer will notify the Contractor in <br /> I <br /> 27 28 writing of all particulars in which the final inspection reveals the work incomplete or <br /> unacceptable. The Contractor shall immediately take such corrective measures as are <br /> 29 necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br /> I30 diligently, and without interruption until physical completion of the listed deficiencies. This <br /> 31 process will continue until the Engineer is satisfied the listed deficiencies have been <br /> 32 corrected. <br /> 33 <br /> I 34 If action to correct the listed deficiencies is not initiated within 7 days after receipt of the <br /> 35 written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> 36 Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br /> I <br /> 37 Section 1-05.7. <br /> 38 The Contractor will not be allowed an extension of contract time because of a delay in <br /> 39 the performance of the work attributable to the exercise of the Engineer's right <br /> I <br /> 40 hereunder. <br /> 41 <br /> 42 Upon correction of all deficiencies, the Engineer will notify the Contractor and the <br /> I <br /> 43 44 Contracting Agency, in writing, of the date upon which the work was considered physically <br /> complete.That date shall constitute the Physical Completion Date of the contract, but shall <br /> 45 not imply acceptance of the work or that all the obligations of the Contractor under the <br /> 46 contract have been fulfilled. <br /> I47 <br /> 48 1-05.11(3) Operational Testing <br /> 49 <br /> I 50 It is the intent of the Contracting Agency to have at the Physical Completion Date a <br /> 51 complete and operable system. Therefore when the work involves the installation of <br /> 52 machinery or other mechanical equipment; street lighting, electrical distribution or signal <br /> I53 systems; irrigation systems; buildings; or other similar work it may be desirable for the <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 15 OF 84 DIVISION T <br /> I <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.