My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Sequim, WA 98382 <br /> 2 Contact: <br /> 3 Nick Janssen (360) 681-7737 <br /> 4 <br /> 5 At the time of returning signals to normal operation, a city of Everett traffic signal I <br /> 6 technician shall be present and on standby since most signals will not return to <br /> 7 normal operation with a turn of the police panel switch and require a conflict monitor <br /> 8 reset. <br /> 9 <br /> 10 Coordination of traffic signal technician shall be coordinated with the following <br /> 11 personnel: <br /> 12 <br /> 13 1. City of Everett Public Works <br /> 14 3200 Cedar Street <br /> 15 Everett, WA 98201 <br /> 16 Contact: <br /> 17 Steve Sawyer (425) 328-0643 <br /> 18 <br /> 19 <br /> 20 1 10.4:GR1 <br /> 21 Measurement , <br /> 22 <br /> 23 1-10.4(3).GR1 <br /> 24 Reinstating Unit Items With Lump Sum Traffic Control <br /> 25 <br /> 26 1-10.4(3),INSTI.GR1 <br /> 27 Section 1-10.4(3) is supplemented with the following: <br /> 28 <br /> 29 F1-10.4(3).OPTI.DOCX <br /> 30 (August 2, 2004) <br /> 31 <br /> 32 The bid proposal contains the item "Project Temporary Traffic Control," lump sum <br /> 33 and the additional temporary traffic control items listed below. The provisions of <br /> 34 Section 1-10.4(1), Section 1-10.4(3), and Section 1-10.5(3) shall apply. <br /> 35 <br /> 36 *** "Portable Changeable Message Sign," per Hour. <br /> 37 "Flaggers", per Hour. *** <br /> 38 <br /> 39 1-10.5.GR1 <br /> 40 Payment <br /> 41 <br /> 42 1-10.5(2).GR1 <br /> 43 Item Bids with Lump Sum for Incidentals <br /> 44 <br /> 45 1-10.5(2),INSTI.GR1 <br /> 46 Section 1-10.5(2) is supplemented with the following: <br /> 47 <br /> 48 GLF 1-10.5(2).DOCX <br /> 49 *** <br /> Uniformed Police Officer", per Hour. <br /> 50 The unit Contract price, when applied to the number of units measured for <br /> 51 this item shall be full compensation for all costs incurred by the Contractor <br /> 52 in performing the Work. When an intersection is staffed on an intermittent <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 40 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.