My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 loading to unloading exceeds 30 minutes, the cover shall be securely attached to protect <br /> 2 the HMA. <br /> 3 <br /> 4 The contractor shall provide an environmentally benign means to prevent the HMA <br /> 5 mixture from adhering to the hauling equipment. Excess release agent shall be drained <br /> 6 prior to filling hauling equipment with HMA. Petroleum derivatives or other coating <br /> 7 material that contaminate or alter the characteristics of the HMA shall not be used. For <br /> I8 live bed trucks, the conveyer shall be in operation during the process of applying the <br /> 9 release agent. <br /> ' 10 <br /> 11 5-04.3(3)C Pavers <br /> 12 HMA pavers shall be self-contained, power-propelled units, provided with an internally <br /> I <br /> 13 14 heated vibratory screed and shall be capable of spreading and finishing courses of HMA <br /> plant mix material in lane widths required by the paving section shown in the Plans. <br /> 15 <br /> I <br /> 16 The HMA paver shall be in good condition and shall have the most current equipment <br /> 17 available from the manufacturer for the prevention of segregation of the HMA mixture <br /> 18 installed, in good condition, and in working order. The equipment certification shall list <br /> I19 the make, model, and year of the paver and any equipment that has been retrofitted. <br /> 20 <br /> 21 The screed shall be operated in accordance with the manufacturer's recommendations <br /> I 22 and shall effectively produce a finished surface of the required evenness and texture <br /> 23 without tearing, shoving, segregating, or gouging the mixture. A copy of the <br /> 24 manufacturer's recommendations shall be provided upon request by the Contracting <br /> I <br /> 25 26 Agency. Extensions will be allowed provided they produce the same results, including <br /> ride, density, and surface texture as obtained by the primary screed. Extensions without <br /> 27 augers and an internally heated vibratory screed shall not be used in the Traveled Way. <br /> I <br /> 28 <br /> 29 When specified in the Contract, reference lines for vertical control will be required. Lines <br /> 30 shall be placed on both outer edges of the Traveled Way of each Roadway. Horizontal <br /> I <br /> 31 32 control utilizing the reference line will be permitted. The grade and slope for intermediate <br /> lanes shall be controlled automatically from reference lines or by means of a mat <br /> 33 referencing device and a slope control device. When the finish of the grade prepared for <br /> I <br /> 34 35 paving is superior to the established tolerances and when, in the opinion of the Engineer, <br /> further improvement to the line, grade, cross-section, and smoothness can best be <br /> 36 achieved without the use of the reference line, a mat referencing device may be <br /> I 37 substituted for the reference line. Substitution of the device will be subject to the <br /> 38 continued approval of the Engineer. A joint matcher may be used subject to the approval <br /> 39 of the Engineer. The reference line may be removed after the completion of the first <br /> 40 course of HMA when approved by the Engineer. Whenever the Engineer determines that <br /> I <br /> 41 any of these methods are failing to provide the necessary vertical control, the reference <br /> 42 lines will be reinstalled by the Contractor. <br /> 43 I 44 The Contractor shall furnish and install all pins, brackets, tensioning devices, wire, and <br /> 45 accessories necessary for satisfactory operation of the automatic control equipment. <br /> I <br /> 46 <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 51 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.