I <br /> 1 amount of material on the pavement surface, stop and correct the operation to eliminate <br /> 2 the excess material. <br /> 3 <br /> I <br /> 4 5 5-04.3(4)A2 Crack Sealing Areas Prior to Paving <br /> In areas where HMA will be placed, use sand slurry to fill the cracks. <br /> 6 <br /> I 7 5-04.3(4)A3 Crack Sealing Areas Not to be Paved <br /> 8 In areas where HMA will not be placed, fill the cracks as follows: <br /> 9 <br /> I10 A. Cracks '/4 inch to 1 inch in width -fill with hot poured sealant. <br /> 11 B. Cracks greater than 1 inch in width —fill with sand slurry. <br /> I 12 <br /> 13 5-04.3(4)B Vacant <br /> 14 <br /> I <br /> 15 5-04.3(4)C Pavement Repair <br /> 16 The Contractor shall excavate pavement repair areas and shall backfill these with HMA <br /> 17 in accordance with the details shown in the Plans and as marked in the field. The <br /> I18 Contractor shall conduct the excavation operations in a manner that will protect the <br /> 19 pavement that is to remain. Pavement not designated to be removed that is damaged as <br /> 20 a result of the Contractor's operations shall be repaired by the Contractor to the <br /> I <br /> 21 22 satisfaction of the Engineer at no cost to the Contracting Agency. The Contractor shall <br /> excavate only within one lane at a time unless approved otherwise by the Engineer. The <br /> 23 Contractor shall not excavate more area than can be completely finished during the <br /> I <br /> 24 same shift, unless approved by the Engineer. <br /> 25 <br /> 26 Unless otherwise shown in the Plans or determined by the Engineer, excavate to a depth <br /> I 27 of 1.0 feet. The Engineer will make the final determination of the excavation depth <br /> 28 required. The minimum width of any pavement repair area shall be 40 inches unless <br /> 29 shown otherwise in the Plans. Before any excavation, the existing pavement shall be <br /> I 30 sawcut or shall be removed by a pavement grinder. Excavated materials will become the <br /> 31 property of the Contractor and shall be disposed of in a Contractor provided site off the <br /> 32 Right of Way or used in accordance with Sections 2-02.3(3) or 9-03.21. <br /> I <br /> 33 <br /> 34 Asphalt for tack coat shall be required as specified in Section 5-04.3(4). A heavy <br /> 35 application of tack coat shall be applied to all surfaces of existing pavement in the <br /> I <br /> 36 pavement repair area. <br /> 37 <br /> 38 Placement of the HMA backfill shall be accomplished in lifts not to exceed 0.35-foot <br /> I <br /> 39 40 compacted depth. Lifts that exceed 0.35-foot of compacted depth may be accomplished <br /> with the approval of the Engineer. Each lift shall be thoroughly compacted by a <br /> 41 mechanical tamper or a roller. <br /> I42 <br /> 43 5-04.3(5) Producing/Stockpiling Aggregates and RAP <br /> 44 Aggregates and RAP shall be stockpiled according to the requirements of Section 3-02. <br /> I <br /> 45 Sufficient storage space shall be provided for each size of aggregate and RAP. Materials <br /> 46 shall be removed from stockpile(s) in a manner to ensure minimal segregation when <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 55 OF 84 DIVISION T <br /> I <br /> WORK ORDER 3751 MARCH 29,2021 <br />