My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tulalip Tribes of Washington 6/20/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Tulalip Tribes of Washington 6/20/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:27:12 PM
Creation date
7/9/2021 4:27:00 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tulalip Tribes of Washington
Approval Date
6/20/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Grant Moen/Tim Benedict
Subject / Project Title
Mortar Repair - Tulalip Pipeline
Tracking Number
0002978
Total Compensation
$417,922.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.7 k PROPOSAL <br /> Reece Construction Company 02/05/2021 <br /> PO Box 1531 <br /> Marysville, WA 98270 <br /> 360-659-9600 <br /> I<_ <br /> QU ;E <br /> TO TulaUip Utilities <br /> JOB LOCATION START DATE <br /> TULALIP WATER PIPELINE SEGMENT 1N E 4 MORTAR LINING <br /> REPAIR <br /> ITEM DESCRIPTION QUAN UNIT UNIT PRICE EXT PRICE <br /> 1 MOBILIZATION 1.000 LS $8,900.00 58,900.00 <br /> 2 TRAFFIC CONTROL PLANS 1,000 LS $7,300.00 $7,300.00 <br /> 3 DEWATER SEGMENTS FOR 1.000 LS $68,000.00 $68,000.00 <br /> • MORTAR REPAIR <br /> 4 REMOVE AND REPLACE FIELD 157.000 EA $1,800.00 $282,600.00 <br /> APPLIED MORTAR <br /> 5 FILL,DISINFECT,AND FLUSH 1.000 LS 5190,000.00 $190,000.00 <br /> SEGMENTS <br /> 7 TRAFFIC CONTROL 550.000 HR $ 70.00 $38,500.00 <br /> SUPERVISOR <br /> • 8 FLAGGER 2,200.000 HR $ 70.00 $154,000.00 <br /> SUBTOTAL: $749,300.00 <br /> TERO TAX: S 13,112.75 <br /> SALES TAX 9.8%: $73,431.40 <br /> TOTAL: S835,844.15 <br /> EXCLUSIONS: <br /> • VALVE LOCKOUT(By City of Everett/Tulalip Utilities) <br /> • VALVE OPERATION(By City of Everett/Tulakip Utilities) <br /> • PERMITS <br /> • BACTI SAMPLING • <br /> CLARIFICATIONS: <br /> • TUA TO PROVIDE SITE ACCESS <br /> • ON SEGMENT 1 THE 36"VALVES AT STA 0-59.92, 1+05.18,AND 3+20 MUST BE CLOSED AND SEVERAL MANWAY LIDS WILL <br /> BE REMOVED UPSTREAM OF THE SEGMENT 1 N WORK FOR SAFETY OF CREWS. <br /> • FOR WORKER SAFETY,2 VALVES MUST BE SHUT WHERE ABLE ON EACH END OF WORK AREA OR CREWS CANNOT ENTER <br /> PIPE. <br /> • FOR WORK IN SEGMENT 4,SEGMENT 3 MUST BE TAKEN OUT OF OPERATION TO PROVIDE A SAFE WORKING ENVIRONMENT <br /> AND ALLOW ACCESS TO REPAIR SEGMENT 3 JOINTS. <br /> • BID ASSUMES DISINFECTING SEGMENTS 1S, 1 N,2,3,4,5S,AND 5N TO THE VALVE AT STA 252+88. <br /> Page 1 of 2 <br /> Page 526 of 1140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.