Laserfiche WebLink
• • <br /> 2020 System Development Fee Calculations <br /> Permit #: PW2010-004 Additional Notes: <br /> Project Address: 7713 BEVERLY BLVD Stormwater system development fees split on two separate permits: ground hard surfaces <br /> Project Name: NEW DRIVEWAY calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions (Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: THAD NEWPORT Date: 10/1/2020 <br /> Outside City Limits? No *Adds a 25% Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: BXXXX-XXX Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2010-004 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 1,200 SF <br /> Stormwater System Dev Fee: $307.08 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />