Laserfiche WebLink
• <br /> projects as required by IEBC Section 705.2. Future work on these buildings will not be <br /> permitted until these deficiencies have been addressed. <br /> The design team is working under the assumption that the previous projects did not include <br /> accessibility improvements. The Intent is for restrooms to be provided by adjacent buildings. See <br /> attached sheet AS-100 updated to show partial interior floor plans denoting location of accessible <br /> restrooms and path. All updates denoted in red. Per follow up comments provided on April 27, <br /> enlarged partial plans have been provided for clarity per attached SKA-001. All accessible <br /> bathrooms features have been verified by school district. <br /> 3. The drawings do not include documentation substantiating that an accessible path is <br /> provided between the new units and the restroom facilities. One or more of the buildings <br /> appears to have paved surfaces based on a review of media images of the project sites, <br /> but this cannot be clearly confirmed. The site conditions for 2215 Pine Street(B2004- <br /> 013) are notably more difficult to verify. Documentation substantiating that a fully- <br /> accessible route is provided between the buildings and into the building(i.e., exterior <br /> ingress doors). These requirements are separate from the improvement requirements <br /> discussed in the previous comments. See IBC Sections 1101.2 and 1104.1. <br /> Accessible paths have been denoted on attached drawings. All updates denoted in red. Photos <br /> of accessible path provided for reference. <br /> Please contact me if you have any further comments or questions. <br /> Respe , <br /> Patrick Brophy <br /> Studio Meng Strazzara <br /> cc: Steve Lee <br /> Attachments: AS-101, SKA-001,Accessible Path Photos <br /> 415 <br />